A plant engineering group needs to set up an assembly line to produce a new product. The
Question:
(a) Develop a project network for this problem.
(b) Determine the expected duration and variance for each activity
(c) Determine the EST, EFT, LST, LFT, and slack for each activity. Also determine the total project completion time and the critical path(s).
(d) Determine the probability that the project will be completed in less than 34 days.
(e) Determine the probability that the project will take
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Managerial Decision Modeling With Spreadsheets
ISBN: 9780136115830
3rd Edition
Authors: Nagraj Balakrishnan, Barry Render, Jr. Ralph M. Stair
Question Posted: