A recalculating conveyor has a total length of 200 m and a speed of 50 m/min. Spacing

Question:

A recalculating conveyor has a total length of 200 m and a speed of 50 m/min. Spacing of part carriers = 5 m. Each carrier holds two parts. Time needed to load a part carrier = 0.15 min. Unloading time is the same. The required loading and unloading rates are 6 parts per min. evaluate the conveyor system design with respect to the three Kwo principles.
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: