Based on the BOM shown below, how many units of part F will be needed if 15
Question:
Based on the BOM shown below, how many units of part F will be needed if 15 units of end item A are needed? If the company decided to purchase part D from suppliers, how would be BOM change? Assume part D is purchased, how many units of part F are needed to make 15 units of end items A?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 83% (18 reviews)
Fs are used in component Ds and Component Cs 15 As x 1 B for each A 15 Bs 15 Bs x ...View the full answer
Answered By
Caroline Kinuthia
Taking care of the smaller details in life has a larger impact in our general well being, and that is what i believe in. My name is Carol. Writing is my passion. To me, doing a task is one thing, and delivering results from the task is another thing. I am a perfectionist who always take things seriously and deliver to the best of my knowledge.
4.90+
1933+ Reviews
4269+ Question Solved
Related Book For
Managing Operations Across the Supply Chain
ISBN: 978-0078024030
2nd edition
Authors: Morgan Swink, Steven Melnyk, Bixby Cooper, Janet Hartley
Question Posted:
Students also viewed these Management Leadership questions
-
The Strubel Company currently makes as many units of Part No. 789 as it needs. David Lin, general manager of the Strubel Company, has received a bid from the Gabriella Company for making Part No....
-
How many of part J will be needed if 40 units of end item A are needed? Managers have decided to outsource part G. Revise the BOM for end item A, assuming that item G is now purchased from a...
-
A manager wants to know how many units of each product to produce on a daily basis in order to achieve the highest contribution to profit. Production requirements for the products are shown in the...
-
A voltage V is applied to a dc electric motor. The armature winding resistance is equal to R. At what value of current flowing through the winding will the useful power of the motor be the highest?...
-
Y = 3x + 5 Determine the slope and the y-intercept. Then use the slope and the y-intercept to graph the equation by hand.
-
RecRoom Equipment Company received an $8,000, six-month, 6 percent note to settle an $8,000 unpaid balance owed by a customer. Prepare journal entries to record the following transactions for...
-
For fluids with \(\operatorname{Pr} <1\) the velocity profile is assumed to be a cubic for \(y
-
You are a management consultant for a 30-year old partner in a large law firm. In a meeting, your client says: According to an article in the New York Times, 57 percent of large law firms have a...
-
Marketing Analytics 6.1 The Expanding Uses of Data Mining and Analytics in the Restaurant Industry** When Damian Mogavero, a restaurant group CFO, realized the vast need for improved data analytics...
-
Required Tasks: 1. Assuming that training can affect the average time but not the standard deviation, the managers are interested in knowing to what level the mean call time needs to be reduced in...
-
Develop an indented BOM for the product structure tree in problem 1. 1 veek B (2) 2 weeks D (2) 3 weeks 1 veek E (4) 2 weeks F (2) 3 weeks E (2) 2 week 1 veek
-
Based on the BOM in problem 4, what is the cumulative lead time for end item A?
-
Xinyi worked for two different employers in 2022 and her total wages were $80,000 for one and $87,000 for the other (total $167,000). Which of the following best describes Xinyis 2022 FICA taxes? a....
-
Clarence bought a $188 000 condo with a $28 000 down payment and took out a mortgage for the remaining $160 000 at 12 percent nominal interest, compounded monthly. We determined that he would make 51...
-
A nation which does not know what it was yesterday, does not know what it is today, nor what it is trying to do. (Woodrow Wilson) What does this statement mean.
-
explain how viatical firms took advantage of the lack of asymmetric information before the discovery of HAART in the mid 1990s, how this new treatment led to the introduction of asymmetric...
-
There are less than the optimal number of pages dedicated to Budgeting in these chapters and the book.It is a little upsetting since Economics (not only classic 'finance') is key to budgeting and is...
-
Q=6004P where Q = days. MC= $50 per customer. the store is paying a rent of $2,000 per day. a) What is the profit-maximizing number of customers the store should have each day, and what price should...
-
A small surface of area A = 1 cm 2 is subjected to incident radiation of constant intensity I i = 2.2 10 4 W/m 2 sr over the entire hemisphere. Determine the rate at which radiation energy is...
-
Cobb Manufacturing Company uses a process cost system and average costing. The following production data is for the month of June 2011. Production Costs Work in process, beginning of the month:...
-
What elements must be proven in order to be successful in a negligence suit? Illustrate your answer with a case (the facts of the case can be hypothetical).
-
Mamas Stuffin is a popular food item during the fall and winter months, but it is marginal in the spring and summer. Use the following demand forecasts and costs to determine which of the following...
-
Mamas Stuffin is a popular food item during the fall and winter months, but it is marginal in the spring and summer. Use the following demand forecasts and costs to determine which of the following...
-
FansForYou is a small, privately owned company that manufactures fans. Large variations in demand due to seasonality have contributed to high costs for the company. FansForYou currently uses a level...
-
Image transcription text Wind tunnel measurements of the pressure and skin friction around a NACA 2415 airfoil at 8 degrees angle of attack resulted in the following data of pressure and skin...
-
Image transcription text The following table contains load-extension data from a tensile test on a cylindrical specimen with gauge length 9mm and gauge diameter 5mm. Load-extension Data Load [KN] 0...
-
Image transcription text Systems Modelling and Analysis - Assignment 1 Due: Friday 25/08/2022 by 5:00:00 pm. To be submitted individually on Canvas and Gradescope. Part 1: Dartboard Positioning...
Study smarter with the SolutionInn App