Question:
Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemical at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion. Therefore, total annual direct labor hours are 96,300 or [1.5 hours à (54,000 + 10,200)]. Expected annual manufacturing overhead is $1,584,280. Thus, the predetermined overhead rate is $16.45 or ($1,584,280 ÷ 96,300) per direct labor hour. The direct materials cost per unit is $18.50 for the home model and $26.50 for the commercial model. The direct labor cost is $19 per unit for both the home and the commercial models. The company's managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as follows.
Instructions
(a) Under traditional product costing, compute the total unit cost of each product. Prepare a simple comparative schedule of the individual costs by product (similar to Illustration 4-3 on page 137).
(b) Under ABC, prepare a schedule showing the computations of the activity-based over-head rates (per cost driver).
(c) Prepare a schedule assigning each activity's overhead cost pool to each product based on the use of cost drivers. (Include a computation of overhead cost per unit, rounding to the nearest cent.)
(d) Compute the total cost per unit for each product under ABC.
(e) Classify each of the activities as a value-added activity or a non-value-added activity.
(f) Comment on (1) the comparative overhead cost per unit for the two products under ABC, and (2) the comparative total costs per unit under traditional costing and ABC.
Transcribed Image Text:
Expected Use of Cost Drivers Expected Use of Drivers by Product Activity Cost Pools Receiving Forming Assembling Testing Painting Packing and shipping Cost Drivers Pounds Machine hours Number of parts Number of tests Gallons Pounds Estimated Overhead $ 80,400 150,500 412,300 51,000 52,580 837,500 $1,584,280 Home 215,000 27,000 165,000 15,500 3,680 215,000 Commercial 120,000 8,000 52,000 10,000 1,578 120,000 335,000 35,000 217,000 25,500 335,000