If the cord AB is 7.5 m long, determine the coordinate position +z of pointB -6 m
Question:
If the cord AB is 7.5 m long, determine the coordinate position +z of pointB
Transcribed Image Text:
-6 m
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 50% (10 reviews)
Position Vector The coordinates for ...View the full answer
Answered By
Deepak Pal
Hi there! Are you looking for a committed, reliable, and enthusiastic tutor? Well, teaching and learning are more of a second nature to me, having been raised by parents who are both teachers. I have done plenty of studying and lots of learning on many exciting and challenging topics. All these experiences have influenced my decision to take on the teaching role in various capacities. As a tutor, I am looking forward to getting to understand your needs and helping you achieve your academic goals. I'm highly flexible and contactable. I am available to work on short notice since I only prefer to work with very small and select groups of students. Areas of interest: Business, accounting, Project management, sociology, technology, computers, English, linguistics, media, philosophy, political science, statistics, data science, Excel, psychology, art, history, health education, gender studies, cultural studies, ethics, religion. I am also decent with math(s) & Programming. If you have a project you think I can take on, please feel welcome to invite me, and I'm going to check it out!
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Question Posted:
Students also viewed these Civil Engineering questions
-
If the 1.5-m-long cord AB can withstand a maximum force of 3500 N, determine the force in cord BC and the distance y so that the 200-kg crate can be supported. -2 m-
-
The arm AB of length 5 m is used to provide an elevated platform for construction workers. In the position shown, arm AB is being raised at the constant rate d/dt = 0.25 rad/s; simultaneously, the...
-
Cord AB of length a is attached to the end B of a spring having an unstretched length b. The other end of the spring is attached to a roller C so that the spring remains horizontal as it stretches....
-
During February, Vargas Company worked on three jobs. Data relating to these three jobs follow: Overhead is assigned on the basis of direct labor hours at a rate of $5.30 per direct labor hour....
-
In the current year, Big Burgers, Inc., expanded its fast food operations by opening several new stores in Texas. The company incurred the following costs in the current year: market appraisal...
-
Which of the following are the two primary constituents of clays? (A) Alumina (Al2O3) and limestone (CaCO3) (B) Limestone (CaCO3) and cupric oxide (CuO) (C) Silica (SiO2) and limestone (CaCO3) (D)...
-
Find the natural frequencies of vibration of the radial drilling machine considered in Problem 12.20 (Fig. 12.26). Data From Problem 12.20:- A simplified model of a radial drilling machine is shown...
-
In December 2014, Learer Company's manager estimated next year's total direct labor cost assuming 50 persons working an average of 2,000 hours each at an average wage rate of $25 per hour. The...
-
Mr M, an architect, was driving in his Suzuki Jimny on the N1 highway between Pretoria and Johannesburg on 1 September 2019. He was adhering to the speed limit and noticed in his rear mirror that a...
-
A. Richard McCarthy (born 2/14/64; Social Security number 100-10-9090) and Christine McCarthy (born 6/1/1966; Social security number 101-21-3434) have a 19-year-old son (born 10/2/99 Social Security...
-
Determine the position vector r directed from point A to point B and the length of cord AB. Take z = 4m. -6 m
-
Determine the distance between the end points A and B on the wire by first formulating a position vector from A to B and then determining itsmagnitude. 1 in 3 in. 30 60 8 in. 2 in.
-
The key events in this case transpired during the late 1970s. Do you believe that such a series of events could occur now? Explain.
-
14 PROBLEMS MATHEMATICS AND STATISTICS FOR FINANCIAL RISK MANAGEMENT 1. Solve for y, where: a. y = ln(e5) b. y = ln(1/e) c. y = ln(10e) 2. The nominal monthly rate for a loan is quoted at 5%. What is...
-
QUESTION 6 A study is concerned with measuring the technical efficiency of a group of colleges affiliated to a university, using the DEA method. It was limited to three inputs (number of students,...
-
1. Suppose a firm is producing output according to Q=100KL. A. Draw a sketch of this firm's isoquant map B. What equation do you use to find a cost-minimizing combination of inputs for a certain...
-
Question 10 0/1 point For the inverse demand curve in the figure below, the maximum willingness to pay for 26 units of environmental quality (EQ) is: p ($/unit) 75.00 a) $507 b) $1,875 c) $432 d)...
-
In this circuit, find R3, 11, 12, 14, 15 and 16. VT = 120 V IT = 6.0 A ZAMBIAMENTIEEL R =60 Q www www R=120 R =11Q www R==2292 www R=330
-
Panther Partners is an investment management company and was recently faxed the stockholders equity statement for a company in which an investment was contemplated. The fax machine malfunctioned and...
-
Write the binomial probability in words. Then, use a continuity correction to convert the binomial probability to a normal distribution probability. P(x 110)
-
How many grams of chromium would be deposited on an object in a chrome-plating bath after 1.00 h at a current of 3.4 A?
-
An asteroid is in an elliptical orbit about the sun such that its perihelion distance is d. If the eccentricity of the orbit is e, determine the aphelion distance of the orbit. Given: d = 9.30 x 10...
-
The rocket is traveling in free flight along an elliptical trajectory A'A .The planet has no atmosphere, and its mass is k times that of the earths. The rocket has an apoapsis and periapsis as shown...
-
A satellite S travels in a circular orbit around the earth. A rocket is located at the apogee of its elliptical orbit for which the eccentricity is e. Determine the sudden change in speed that must...
-
On January 1, 2023, Bertrand, Incorporated, paid $86,900 for a 40 percent interest in Chestnut Corporation's common stock. This investee had assets with a book value of $229,500 and liabilities of...
-
Landen Corporation uses a job-order costing system. At the beginning of the year, the company made the following estimates: Direct labor-hours required to support estimated production Machine-hours...
-
Explain the concept of gene-environment interactions, and how these interactions influence the expression of complex traits and the risk of developing multifactorial diseases ?
Study smarter with the SolutionInn App