Match each item on the left with the most appropriate
Match each item on the left with the most appropriate item on the right.
1. “Ad hoc” processes.......... a. Test (SDLC)
2. Business rules............ b. Risk of SDLC
3. Consistent project standards. c. Repeatable (CMM)
4. Cost overrun....... d. Optimized (CMM)
5. Discrete project standards... e. Managed (CMM)
6. Feasibility study....... f. Initiation/planning (SDLC)
7. Improvement part of organizational culture.. g. Design (SDLC)
8. Modular programming code......... h. Defined (CMM)
9. Simulations............. i. Chaotic (CMM)
10. Statistical project control...... j. Build (SDLC)