Maximize f = 24x1 + 30x2 + 18x3 + 18x4 subject to 12x1 + 16x2 + 20x3
Question:
12x1 + 16x2 + 20x3 + 8x4 ≤ 880
5x1 + 10x2 + 10x3 + 5x4 ≤ 460
10x1 - 5x2 + 8x3 + 5x4 ≤ 280
Use Excel to solve each linear programming problem.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 53% (15 reviews)
Solution Maximum 1728 at x 1 36 x ...View the full answer
Answered By
Sagar Kumar
I am Mechanical Engineer with CGPA of 3.98 out of 4.00 from Pakistan. I went to Government Boys Degree College, Sehwan for high school studies.
I appeared in NUST Entrance Exam for admission in university and ranked #516. My mathematics are excellent and I have participated in many math competitions and also won many of them. Recently, I participated in International Youth Math Challenge and was awarded with Gold Honor. Now, I am also an ambassador at International Youth Math Challenge,
I have been teaching when I was in 9th class class year 2012. I have taught students from 6th class to university level.
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Mathematical Applications for the Management Life and Social Sciences
ISBN: 978-1305108042
11th edition
Authors: Ronald J. Harshbarger, James J. Reynolds
Question Posted:
Students also viewed these Calculus questions
-
Consider the following convex programming problem: Maximize f(x) = 24x1 x21 + 10x2 x22, Subject to x1 10, x2 15, and x1 0, x2 0.
-
Consider the following linearly constrained convex programming problem: Maximize f(x) = 3x1 x2 + 40x1 + 30x2 4x21 x41 3x22 x42, Subject to 4x1 + 3x2 12 x1 + 2x2 4 and x1 0, x2 0.
-
Maximize the total output f = x1 + x2 + x3 (production figures of three different production processes subject to input constraints (limitation of machinetime) 4x5x2 8.x1 8x5x2 ++ + 8.x3 = 12, + 4x3...
-
Consider an ideal dual-loop heat-powered refrigeration cycle using R-134a as the working fluid, as shown in Fig. P9.135. Saturated vapor at 200 F leaves the boiler and expands in the turbine to the...
-
(a) For a bicycle, how is the angular speed of the rear wheel (wg) related to that of the pedals and front sprocket (wF), Fig. 8-52? That is, derive a formula for wR/wF. Let NF and NR be the number...
-
Research scholarships that fit your personal profile and estimate your potential financial aid. Then you will analyze the results of your research and explain your plan for achieving all the aid you...
-
Alicin Nagle, an in-charge auditor, is reviving the inventory controls for the city of Carlton's vehicle maintenance facility. Nagle has learned the following: a. Vehicle maintenance records indicate...
-
Consider the following June actual ending balances and July 31, 2012, budgeted amounts for Oleans.com: a. June 30 inventory balance, $17,750 b. July payments for inventory, $4,300 c. July payments of...
-
Kai Holdings Pte Ltd (KHPL), a Singapore-incorporated company, has been in the business of manufacturing medical devices since 1999. It is wholly owned by Then Kai (75%) and his brother Quen Kai...
-
Ariel LeBec, of Ariels Sandwich Shoppe, sells sandwiches and soda from a sidewalk cart in a popular park near her home in New Orleans. She sets up her rented cart in the summers to raise money for...
-
Maximize f = 64x + 36y + 38z subject to 4x + 2y + 2z 40 8x + 10y + 5z 90 4x + 4y + 3z 30 Use Excel to solve each linear programming problem.
-
Set up the simplex matrix used to solve each linear programming problem. Assume all variables are nonnegative. 1. Maximize f = 3x + 7y subject to 2x + 5y 400 x + 2y 175 2. Maximize f = x + 3y subject...
-
10 kg of water in a piston cylinder arrangement exists as saturated liquid/vapor at 100 kPa, with a quality of 50%. It is now heated so the volume triples. The mass of the piston is such that a...
-
1. An instructor allows a calculator in exams (midterm and final), but only the simplest calculators are allowed (no functions, no memory, etc., only 4 basic operations and power/root; these sell in...
-
* This is a PowerPoint assignment * I really need help. I am currently very sick with the Flu and I am trying my best to finish homework for the week WILL RATE 5 STARS!!! *** All information needed...
-
G H K M udent name 1: Student name 2: hter your student ID number ote: if you and your partner are working on separate files, ensure the same student name and student numbers are entered for student...
-
Keith Corporation Balance Sheets December 31 Assets 2019 2018 Cash $1,500 $1,040 Marketable securities 1,820 1,170 Accounts receivable 1,950 1,830 Inventories 2,940 2,800 Total current assets $8,210...
-
Assume Ellina earns a 4 percent after-tax rate of return and that she owes a friend $1,500. Would she prefer to pay the friend $1,500 today or $1,725 in four years?
-
On January 1, 2021, Maywood Hydraulics leased drilling equipment from Aqua Leasing for a four-year period ending December 31, 2024, at which time possession of the leased asset will revert back to...
-
A 2500-lbm car moving at 15 mi/h is accelerated at a constant rate of 15 ft/s 2 up to a speed of 50 mi/h. Calculate force and total time required?
-
With U.S. Department of Energy data for selected years from 2000 and projected to 2030, sulphur dioxide emissions from electricity generation (in millions of short tons per year) can be modeled by...
-
Suppose that a definite integral is to be approximated and it is found that to achieve a specified accuracy, n must satisfy n 4.8. What is the smallest n that can be used, if (a) The Trapezoidal...
-
The per capita disposable income (in dollars per year) in the United States for selected years from 2014 and projected to 2040 can be modeled by I(t) = 0.5532t 2 + 738.5t + 34,430 where t is the...
-
Question: Read the document on this link: https://pui2022q4.tiiny.site/ 1. You form part of a company in South Africa and you have to continuously do business locally and internationally on the...
-
Banjo Education Corp. issued a 4%, $80,000 bond that pays interest semiannually each June 30 and December 31. The date of issuance was January 1, 2020. The bonds mature after four years. The market...
-
A projectile if fired from 19.6m above the ground with an initial speed of 55.6m/s at an angle of 41.2 degrees above the horizontal. a) Determine the time necessary for the projectile to reach its...
Study smarter with the SolutionInn App