ammonia nitrate production

Project Description:

project task (ammonia nitrate production)
1. each student is assigned a specific industry to research. the outcome will be a material and energy balance for a plant producing 100 tonnes/day (100,000 kg/d) of finished goods.
2. the final report is demonstrated. make sure your data are complete.
3. each student must research his or her particular industry to make sure that equipment is sized correctly and to accurately depict plant-wide energy utilization.
4. material mass balances and energy balances are required.
5. if assumptions occur, they must be clearly annotated.
6. the final report consists of an executive summary and all pertinent secondary data. executive summary as follows:
7. production output: 100 tonnes/day


8. summary table
 raw material (list what they are) tonnes/day
fossil fuel use: kj/kg
 steam use: kj/kg
electricity: kw and
kwh/kg
water: kgwater/kgproduct
 environmental mgt.: kj/kg


1. the second page of the report will include a one-lined diagram of plant activities.
2. there must also be a table indicating energy utilization/kg product at each station during the production process. for electric motors reference 10 hp motors and larger. as example for a steam milling operation noted on the diagram might be: steam @ 400 oc, 0.5 mpa è 12.5 kj/kg. the energy content of steam can be found at thermodynamic tables.
3. the final entry in the report is a summary of energy management ideas that might reduce unit consumption and so reduce plant energy costs. do not overlook costs and equipment needed for waste management.
4. in your narrative describe energy management opportunities that apply at systems in your assigned plant. a good guideline is to shoot for the big energy users first. 10% cost reduction for a million dollar system makes bosses happier than 50% cost reduction at a $25,000 system.
5. this project is due 20 june 2014. please meet this requirement.

requirements:
1- one line diagram of the process due 8 june 2014
2- an essay describing the process due 11 june 2014
3- a project of a report described above due 20 june 2014
Skills Required:
Project Stats:

Price Type: Negotiable

Completed
Total Proposals: 12
1 Current viewersl
33 Total views
Project posted by:

Proposals

Proposals Reputation Price offered
  • 4.5
    355 Jobs 236 Reviews
    $0 in 0 Day
  • 4.7
    7 Jobs 7 Reviews
    $0 in 0 Day
  • 4.7
    48 Jobs 26 Reviews
    $0 in 0 Day
  • 4.8
    405 Jobs 247 Reviews
    $0 in 0 Day
  • 4.8
    21 Jobs 19 Reviews
    $100 in 0 Day
  • 0.0
    0 Jobs 0 Reviews
    $0 in 0 Day
  • 4.9
    59 Jobs 52 Reviews
    $0 in 0 Day
  • 4.8
    60 Jobs 32 Reviews
    $0 in 0 Day
  • 4.0
    72 Jobs 31 Reviews
    $0 in 0 Day
  • 5.0
    13 Jobs 7 Reviews
    $0 in 0 Day