q32 - the upper and lower specification limits for a component are 3.98 and 4.02 inches, respectively. the process standard deviation is .004, and the process average is 4.005 inches. is this process capable of achieving four-sigma performance (the four-sigma performance target value is 1.33)? your discussion should include the calculation of cpk and cp, as needed.

q33 - burdell salad dressings uses a kanban system. the daily demand for corrugated boxes used in packaging its dressings is 287 boxes. the average waiting time for a container of boxes is 0.1 day. the processing time for a container of boxes is 0.3 day, and a container holds 10 boxes. if burdell wishes to use a 10% policy variable, how many containers are needed? round your answer up to the next highest integer value.

q34 - happiness, inc. uses a kanban system. the daily demand for the most critical part, the smylie, is 549 units over an eight-hour production period. the average waiting time for a container of smylies is 29 minutes. the processing time for a container filled with smylies is 13 minutes, and a container holds 5 units. if the company wishes to use a 5% policy variable, how many containers are needed? round your answer up to the next highest integer value
Skills Required:
Project Stats:

Price Type: Negotiable

Expired
Total Proposals: 6
1 Current viewersl
32 Total views
Project posted by:

Proposals

Proposals Reputation Price offered
  • 4.9
    59 Jobs 52 Reviews
    $0 in 0 Day
  • 5.0
    7 Jobs 7 Reviews
    $0 in 0 Day
  • 4.4
    31 Jobs 22 Reviews
    $30 in 0 Day
  • 4.8
    551 Jobs 388 Reviews
    $0 in 0 Day
  • 5.0
    44 Jobs 43 Reviews
    $0 in 0 Day