wiley plus problem p21-1a

Project Description:

kasten company manufactures bowling balls through two processes: molding and packaging. in the molding department, the urethane, rubber, plastics, and other materials are molded into bowling balls. in the packaging department, the balls are placed in cartons and sent to the finished goods warehouse. all materials are entered at the beginning of each process. labor and manufacturing overhead are incurred uniformly throughout each process. production and cost data for the molding department during june 2012 are presented below.
production data
june

beginning work in process units -0-
units started into production 20,000
ending work in process units 2,000
percent complete-ending inventory 60%

cost data
materials $198,000
labor 50,400
overhead 112,800

total $361,200

determine the costs to be assigned to the units transferred and in process for june.
costs accounted for
transferred out $
work in process, june 30
materials $
conversion costs


total costs

complete the production cost report for the molding department for the month of june. (if answer is zero, please enter 0. do not leave any fields blank.)
Skills Required:
Project Stats:

Price Type: Negotiable

Expired
Total Proposals: 6
1 Current viewersl
33 Total views
Project posted by:

Proposals

Proposals Reputation Price offered
  • 5.0
    49 Jobs 21 Reviews
    $10 in 0 Day
  • 4.0
    5 Jobs 4 Reviews
    $0 in 0 Day
  • 4.8
    546 Jobs 386 Reviews
    $12 in 0 Day
  • 0.0
    0 Jobs 0 Reviews
    $0 in 0 Day
  • 4.4
    60 Jobs 42 Reviews
    $0 in 0 Day