Consider a heated manufacturing shop with a total conditioned volume of 1,000 m3. A measurement of the

Question:

Consider a heated manufacturing shop with a total conditioned volume of 1,000 m3. A measurement of the air leakage characteristics of the shop showed an infiltration rate of 1.5 ACH. Determine the energy savings due to caulking and weather stripping improvements of the exterior envelope of the facility to reduce air infiltration by half. Assume the shop is located in Seattle, Washington, and is heated by a gas-fired boiler with a seasonal efficiency of 80 percent.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: