Determine the center (or vertex if the curve is a parabola) of the given curve. Sketch each
Question:
Determine the center (or vertex if the curve is a parabola) of the given curve. Sketch each curve.
4x2 + 9y2 + 24x = 0
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 66% (6 reviews)
To find the center of the given equation we first need to rewrite it in standard form by compl...View the full answer
Answered By
Darwin Romero
I use a hands-on technique and am approachable to my students. I incorporate fun into my lessons when possible. And while my easy-going style is suitable for many subjects and grades, I am also able to adapt my style to the needs of the student. I can describe myself as friendly, enthusiastic and respectful. As a teacher, we can easily get respect from the students if they would feel respected first
0.00
0 Reviews
10+ Question Solved
Related Book For
Basic Technical Mathematics
ISBN: 9780137529896
12th Edition
Authors: Allyn J. Washington, Richard Evans
Question Posted:
Students also viewed these Mathematics questions
-
In Problems 1-3, use the process of completing the square to transform the given equation to a standard form. Then name the corresponding curve and sketch its graph. 1. 4x2 + 4y2 - 24x + 36y + 81 = 0...
-
The graph of the parametric curve is O A circle with center (-37,-1) and with a clockwise direction. A circle with center (-37,-1) and with a counterclockwise direction. O A parabola with vertex...
-
The graph of the parametric curve is O A circle with center (-5,-1) and with a clockwise direction. O A parabola with vertex (-5,-1). O A circle with center (-5,-1) and with a counterclockwise...
-
Assuming 10% minimum required reserve ratio, 5% excess reserve ratio, and people holding 10% of cash received at home (not deposited in the banks), the money multiplier is equal to Select one: a....
-
In developing their warranty policy, an automobile company estimates that over a 1-year period 17% of their new cars will need to be repaired once, 7% will need repairs twice, and 4% will require...
-
A force F = (4xi + 3yj) N acts on an object as the object moves in the x direction from the origin to x = 5.00 m. Find the work = F dx done on the object by the force.
-
What are the four specific objectives of internal accounting control?
-
The management of Ballard MicroBrew is considering the purchase of an automated bottling machine for $120,000. The machine would replace art old piece of equipment that costs $30,000 per year to...
-
A site is available at a purchase price of GH 1 5 0 , 0 0 0 and it is anticipated that planning permission could be obtained for a factory of 7 5 0 0 m 2 or an office block of 1 7 5 0 0 m 2 . The...
-
Find the equations of the hyperbolas satisfying the given conditions. The center of each is at the origin. The difference of distances to (x, y) from (10, 0) and (10, 0) is 12.
-
Plot the curves of the given polar equations in polar coordinates. r 2r cos =6 (hyperbola)
-
What is a lower bound for the price of a two-month European put option on a non-dividend-paying stock when the stock price is $58, the strike price is $65, and the risk-free interest rate is 5% per...
-
Suppose that P(B|A) = 2/5, P(B) = 3/5 and P(A) = 1/2. What is P(B|AC)?
-
An engineer pulls a control handle to operate a machine. The handle is attached at the upper end of a rigid shaft, at D. The lower end of the shaft is pinned at A. A nylon rope joins to the shaft at...
-
SP #1: A broken kitchen faucet leaks at a rate of 3 drops per minute. Assuming that there are 46,000 drops per gallon and approximating water as a saturated liquid at 68F, determine the following: A)...
-
For the following data, calculate (x+1)* (5, 2, 8, 6, 9, 6, 4, 6, 10) QUESTION 10 Calculate mean of the following scores: (1, 2, 5, 6, 4, 2, 7, 8, 10, 10} QUESTION 11 Calculate the standard deviation...
-
(2) Given a ductile wrought steel material, whose yield tensile strength S = 36 ksi. and ultimate tensile strength Sut = 72 ksi. Select its design factor N = 2 to design the machine element. (a) When...
-
(a) How much would setup time have to be reduced in order to make the batch size of 3000 pieces equal to the economic order quantity? (b) How much would total inventory costs be reduced if the EOQ =...
-
Carlton Stokes owns and operates a car-detailing business named SuperShine & Detailing. For $150, Carltons business will hand wash and wax customers cars, vacuum the interior, and thoroughly clean...
-
In problem, find the complex zeros of each polynomial function. Write f in factored form. f(x) = x 4 + 3x 3 - 19x 2 + 27x - 252
-
In problem, solve each inequality. Graph the solution set. -2 1 - 3x <1
-
In problem, list the potential rational zeros of each polynomial function. Do not attempt to find the zeros. f(x) = 6x 4 - x 2 + 2
-
Given y = -log x, what is x when y = 5?
-
Let ???? ( ???? ) = 4 ( ???? - 7 ) 2 ( ???? + 1 1 ) 6 ( 2 ???? - 1 0 ) 2 . Which monomial does ???? ( ???? ) behave most like when ???? gets very large?
-
Simplify: (36-4).5 The solution is I
Study smarter with the SolutionInn App