Use a Linear Approximation of (x, y, z) = x 2 + y 2 + z to
Question:
Use a Linear Approximation of ƒ(x, y, z) = √x2 + y2 + z to estimate √7.12 + 4.92 + 69.5. Compare with a calculator value.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 0% (1 review)
The function whose value we want to approximate is fx y z We will use the linear appr...View the full answer
Answered By
Kainat Shabbir
i am an experienced qualified expert with a long record of success helping clients overcome specific difficulties in information technology, business and arts greatly increasing their confidence in these topics. i am providing professional services in following concerns research papers, term papers, dissertation writing, book reports, biography writing, proofreading, editing, article critique, book review, coursework, c++, java, bootstarp, database.
5.00+
184+ Reviews
255+ Question Solved
Related Book For
Question Posted:
Students also viewed these Mathematics questions
-
Use a linear approximation (or differentials) to estimate the given number. (a) (1.999)4 (b) 31001
-
A firm has a Cobb - Douglas production function that is homogeneous of degree one: ( q = A L ^ { alpha } K ^ { 1 - alpha } ) . Derive the long - run cost function as a function only of factor prices...
-
A researcher wanted to find out if there was difference between older movie goers and younger movie goers with respect to their estimates of a successful actors income. The researcher first...
-
Q4. a- In a uniform electric field, what factors does the electrical potential energy depend on? b- What is the difference between APE electric and PE electric?
-
A horizontal cylindrical drum is 2.00m in diameter and 4.00 m long. The drum is slowly filled with benzene (density = 0.879g/cm3). Derive a formula for W, the weight in Newton's of the benzene in the...
-
George Industries manufactures three models of a product in a single plant with two departments: Cutting and Assembly. The company has estimated costs for each of the three product models: the...
-
The beam is made of oak, for which \(E_{0}=11 \mathrm{GPa}\). Determine the slope and displacement at point \(A\). 200 mm 400 mm I A 4 kN/m -3 m- + -3 m- B
-
Great Plains Railroad Inc. is considering acquiring equipment at a cost of $ 450,000. The equipment has an estimated life of 10 years and no residual value. It is expected to provide yearly net cash...
-
ed Campbell Company established a predetermined variable overhead cost rate at $24.90 per direct labor hour. The actual variable overhead cost rate was $23.10 per hour. The planned level of labor...
-
The plane z = 2x y 1 is tangent to the graph of z = (x, y) at P = (5, 3). (a) Determine (5, 3), x (5, 3), and y (5, 3). (b) Approximate (5.2, 2.9).
-
Suppose that (4, 4) = 3 and x (4, 4) = f y (4, 4) = 1. Use the Linear Approximation to estimate (4.1, 4) and (3.88, 4.03).
-
Calculate dollar amounts accurate to the cent and percent amounts to three-figure accuracy. 0.75% of $100 is what amount?
-
Graph the lines in Problems 31-44. \(y=4 x+5\)
-
We wish to separate ethanol from water from two different feed solutions in a distillation column with a total condenser and a partial reboiler, at a column pressure of \(1 \mathrm{~atm}\). One of...
-
Graph the lines in Problems 31-44. \(y=50 x\)
-
Three parallel-plate capacitors are separately connected to identical batteries. Capacitor 1 has a plate area \(A\) and a plate separation \(d\). Capacitor 2 has a plate area \(2 A\) and a plate...
-
Graph the lines through the given points and with the given slopes as indicated in Problems 19-30. \((2,3) ; m=0\)
-
Build on the results of Prob. 1341, p. 729, to find factors of safety for bending and wear for gear C. Both gears are made from Grade 2 carburized and hardened steel. Use a face-width of 4 times the...
-
Three forces with magnitudes of 70pounds, 40 pounds, and 60 pounds act on an object at angles of 30, 45, and 135, respectively, with the positive x-axis. Find the direction and magnitude of the...
-
Find the sum. (-+}) 80 - 2.
-
Find the sum The sum of the first 120 terms of sequence 14, 16, 18, 20, ...
-
Find the sum The sum of the first 46 terms of sequence 2, -1, -4, -7 ...
-
An invoice is dated July 27 for $646 with terms of 3/10 EOM. The merchandise was received on Aug 3. How much is due (a). if the invoice is paid on or before August 10? (b), on September 10? (c). on...
-
1. If (x+yi) = 7 + 9i Where x and y are real, what is the value of (x + yi)(x-yi)? 2. When you started your homework assignment, your friend already had 6 exercises done. You can do about 3 exercises...
-
At the beginning of the period, the Fabricating Department budgeted direct labor of $69,600 and equipment depreciation of $25,000 for 5,800 hours of production. The department actually completed...
Study smarter with the SolutionInn App