Cites as a pitfall the utilization of a subset of the performance equation as a performance metric.

Question:

Cites as a pitfall the utilization of a subset of the performance equation as a performance metric. To illustrate this, consider the following data for the execution of a program in different processors.a. b. Processor P1 P2 P1 P2 Clock Rate 4 GHz 3 GHz 3 GHz 2.5 GHz CPI 0.9 0.75 1.1 1.0 No. Instr. 5.00E+06

Another fallacy is to consider that the processor executing the largest number of instructions will need a larger CPU time. Considering that processor P1 is executing a sequence of 106 instructions and that the CPI of processors P1 and P2 do not change, determine the number of instructions that P2 can execute in the same time that P1 needs to execute 106 instructions.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  answer-question

Computer Organization And Design The Hardware Software Interface

ISBN: 9780123747501

4th Revised Edition

Authors: David A. Patterson, John L. Hennessy

Question Posted: