Using a cost data guide, such as Means or The Guide, prepare an assemblies estimate for a
Question:
Using a cost data guide, such as Means or The Guide, prepare an assemblies estimate for a 2,000 square foot single story residence with at least 20-line items. Apply all of the appropriate markups.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 0% (1 review)
Assemblies Estimate for a 2000 Sq Ft SingleStory Residence Assumptions Singlestory residence with a ...View the full answer
Answered By
Ashington Waweru
I am a lecturer, research writer and also a qualified financial analyst and accountant. I am qualified and articulate in many disciplines including English, Accounting, Finance, Quantitative spreadsheet analysis, Economics, and Statistics. I am an expert with sixteen years of experience in online industry-related work. I have a master's in business administration and a bachelor’s degree in education, accounting, and economics options.
I am a writer and proofreading expert with sixteen years of experience in online writing, proofreading, and text editing. I have vast knowledge and experience in writing techniques and styles such as APA, ASA, MLA, Chicago, Turabian, IEEE, and many others.
I am also an online blogger and research writer with sixteen years of writing and proofreading articles and reports. I have written many scripts and articles for blogs, and I also specialize in search engine
I have sixteen years of experience in Excel data entry, Excel data analysis, R-studio quantitative analysis, SPSS quantitative analysis, research writing, and proofreading articles and reports. I will deliver the highest quality online and offline Excel, R, SPSS, and other spreadsheet solutions within your operational deadlines. I have also compiled many original Excel quantitative and text spreadsheets which solve client’s problems in my research writing career.
I have extensive enterprise resource planning accounting, financial modeling, financial reporting, and company analysis: customer relationship management, enterprise resource planning, financial accounting projects, and corporate finance.
I am articulate in psychology, engineering, nursing, counseling, project management, accounting, finance, quantitative spreadsheet analysis, statistical and economic analysis, among many other industry fields and academic disciplines. I work to solve problems and provide accurate and credible solutions and research reports in all industries in the global economy.
I have taught and conducted masters and Ph.D. thesis research for specialists in Quantitative finance, Financial Accounting, Actuarial science, Macroeconomics, Microeconomics, Risk Management, Managerial Economics, Engineering Economics, Financial economics, Taxation and many other disciplines including water engineering, psychology, e-commerce, mechanical engineering, leadership and many others.
I have developed many courses on online websites like Teachable and Thinkific. I also developed an accounting reporting automation software project for Utafiti sacco located at ILRI Uthiru Kenya when I was working there in year 2001.
I am a mature, self-motivated worker who delivers high-quality, on-time reports which solve client’s problems accurately.
I have written many academic and professional industry research papers and tutored many clients from college to university undergraduate, master's and Ph.D. students, and corporate professionals. I anticipate your hiring me.
I know I will deliver the highest quality work you will find anywhere to award me your project work. Please note that I am looking for a long-term work relationship with you. I look forward to you delivering the best service to you.
3.00+
2+ Reviews
10+ Question Solved
Related Book For
Construction Cost Estimating
ISBN: 9780367902681
1st Edition
Authors: John E. Schaufelberger, Len Holm
Question Posted:
Students also viewed these Business questions
-
Without the benefit of drawings or specifications, would the estimate from Exercise 1 be considered a budget, or a guaranteed maximum price, or a lump sum bid? If your answer was budget, what changes...
-
For the residential assemblies estimate prepared in Exercise 1, prepare a list of at least five assumptions and allowances that were used to develop the estimate. Data from exercise 1 Using a cost...
-
List three specific parts of the Case Guide, Objectives and Strategy Section (See below) that you had the most difficulty understanding. Describe your current understanding of these parts. Provide...
-
Explain, in your own words, what is meant by source inspection.
-
(a) Using the data in Table 18.1, compute the resistance of a copper wire 3 mm (0.12 in.) in diameter and 2 m (78.7 in.) long. (b) What would be the current flow if the potential drop across the ends...
-
An asset purchased for $100,000 with S = $20,000 after 5 years was depreciated using the 5-year MACRS rates. Expenses averaged $18,000 per year, and the effective tax rate is 30%. The asset was...
-
An indirect way of measuring of secondary emission from ponds or large bodies of water used in waste treatment is to measure the concentration and velocity over the surface. The data can then be...
-
On December 1, Showcase Interiors purchased a shipment of furniture from Colonial House by paying $10,500 cash and issuing an installment note payable in the face amount of $28,800. The note is to be...
-
Question: Christian Volhard works as a financial analyst for Tooele Company, which operates a large chain of fast-food restaurants. One of the key costs of the fast-food restaurants is the cost of...
-
How does a small residential general contractor estimate?
-
Why do larger residential developers not have selected subcontractors they use on every project?
-
Consider how organizational goals may have contributed to some improvements in congestive heart failure and acute MI care while improvements in pneumonia lagged. Write one goal statement that the...
-
For an object in curvilinear motion, (a) the objects velocity components are constant, (b) the y-velocity component is necessarily greater than the x-velocity component, (c) there is an acceleration...
-
An electron accelerates from \(0.700 c_{0}\) to \(0.900 c_{0}\) in the Earth reference frame. In this reference frame, by what factor do \((a)\) its mass and \((b)\) its inertia increase?
-
Let us explore whether there is any way to distinguish acceleration due to rotation from acceleration due to a gravitational force. Imagine a deep bowl with a small volume of milk in it. (a) What...
-
Chang Industries purchased a piece of equipment on January 1, 2025. The equipment cost HK\($600,000\) and has an estimated life of 8 years and a residual value of HK\($80,000.\) What was the...
-
Determine the magnitude of the momentum of a muon in a reference frame in which the muon moves with speed \(0.500 c_{0}\). The mass of a muon is 207 times the mass of an electron.
-
What do you think are three common mistakes made by novice systems analysts during programming and testing?
-
A stock has had returns of 8 percent, 26 percent, 14 percent, 17 percent, 31 percent, and 1 percent over the last six years. What are the arithmetic and geometric average returns for the stock?
-
Describe the two important factors in selecting an overhead allocation base.
-
What cost information is recorded on the debit side of the manufacturing overhead account, and what information is recorded on the credit side?
-
When is manufacturing overhead underapplied? When is it overapplied?
-
(a) Explain the flowing terms: i. Monostable. ii. Astable. 111. Bi-stable. iv. Latch. CK Q CK Fig Bl b) What type of device is shown in Fig. B1 if the waveforms illustrated are present at its CK and...
-
What will the output be of the code above? Out 4: Choose... Out 6: Choose...
-
Select any processing method and discuss how you would use it to prepare 50-nm thin films of poly(fluorene)s for light emitting diodes. Select any processing method and discuss how you would use it...
Study smarter with the SolutionInn App