What is the difference between a change order proposal and a claim?
Question:
What is the difference between a change order proposal and a claim?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (3 reviews)
A change order proposal and a claim are two distinct processes that are often encountered in construction projects Heres a breakdown of the difference ...View the full answer
Answered By
Somshukla Chakraborty
I have a teaching experience of more than 4 years by now in diverse subjects like History,Geography,Political Science,Sociology,Business Enterprise,Economics,Environmental Management etc.I teach students from classes 9-12 and undergraduate students.I boards I handle are IB,IGCSE, state boards,ICSE, CBSE.I am passionate about teaching.Full satisfaction of the students is my main goal.
I have completed my graduation and master's in history from Jadavpur University Kolkata,India in 2012 and I have completed my B.Ed from the same University in 2013. I have taught in a reputed school of Kolkata (subjects-History,Geography,Civics,Political Science) from 2014-2016.I worked as a guest lecturer of history in a college of Kolkata for 2 years teaching students of 1st ,2nd and 3rd year. I taught Ancient and Modern Indian history there.I have taught in another school in Mohali,Punjab teaching students from classes 9-12.Presently I am working as an online tutor with concept tutors,Bangalore,India(Carve Niche Pvt.Ltd.) for the last 1year and also have been appointed as an online history tutor by Course Hero(California,U.S) and Vidyalai.com(Chennai,India).
4.00+
2+ Reviews
10+ Question Solved
Related Book For
Construction Cost Estimating
ISBN: 9780367902681
1st Edition
Authors: John E. Schaufelberger, Len Holm
Question Posted:
Students also viewed these Business questions
-
What is the difference between a change in demand and a change in quantity demanded? Between a change in supply and a change in quantity supplied?
-
What is the difference between a change in supply and a change in quantity supplied?
-
What is the difference between a change in demand and a change in quantity demanded?
-
If the firm's lowest average cost is $52 and the corresponding average variable cost is $26, what does it pay a perfectly competitive firm to do if? a. The market price is $51 b. The price is $36 c....
-
For a concentration cell, briefly explain why corrosion occurs at that region having the lower concentration.
-
Both Viacom and Paramount owned a diverse group of entertainment businesses. QVC was a televised shopping channel. The Paramount board of directors accepted a merger offer from Viacom at a price of...
-
Two rectangular plates of sizes \(L\) and \(W\) are facing each other and separated by a distance \(H\). Derive an expression for the view factor between these disks. Find the limit if \(W\) is...
-
Classic Cabinets has one factory in which it produces two product lines. Walter manages the Wood Division, which produces wood cabinets, and Mary manages the Metal Division, which produces metal...
-
Vector A=(4,6) and Vector B=(8,4), what is the cross product of Ax B? b) What is the cross product of B x A?
-
Why might a project owner want to see the negotiated GCs monthly cost forecast?
-
Would a project owner be allowed to see a lump sum GCs monthly cost forecast?
-
Fill in the blanks with an appropriate word, phrase, or symbol(s). Meters, m, are a measure of ________.
-
One reference book states that, after a large earthquake, Earth can be treated as an oscillator that has a period of \(54 \mathrm{~min}\) and a quality factor of 400 . (a) What percentage of the...
-
Critical damping is a term used to describe a situation where the damping coefficient \(b\) is just great enough that no oscillation occurs. (In critical damping, a moving part is displaced but...
-
A damped oscillator has a quality factor of 20 . (a) By what fraction does the energy decrease during each cycle? (b) By what percentage does the damped angular frequency \(\omega_{\mathrm{d}}\)...
-
A \(0.500-\mathrm{kg}\) block oscillates up and down on a vertical spring for which \(k=12.5 \mathrm{~N} / \mathrm{m}\). The initial amplitude of the motion is \(0.100 \mathrm{~m}\). (a) What is the...
-
A gong makes a loud noise when struck. The noise gradually gets less and less loud until it fades below the sensitivity of the human ear. The simplest model of how the gong produces the sound we hear...
-
Describe the four approaches to integration testing.
-
Catalytic hydrogenation of naphthalene over PdC results in rapid addition of 2 moles of H 2 . Propose a structure for this product.
-
What is the difference between an activity and a cost driver?
-
How do cost flows using activity-based costing differ from cost flows using one plantwide rate?
-
Describe the five steps required to implement activity-based costing.
-
Brew Shack is a small brewery that is trying to better understand its costs. The company, which currently uses traditional job-order costing, allocates overhead costs using a single cost driver. The...
-
HyperLens has the following budgeted cost information: Budgeted manufacturing overhead $1,928,500 Budgeted machine hours 8,000 Budgeted direct labor hours 4,200 Budgeted units 40,000 Cost Pool Total...
-
Perform relevant analysis of the limiting factor (16,600 labour hours), determine how many units of each product to be produced and sold in order to maximise the total contribution margin?
Study smarter with the SolutionInn App