Ivan, an industrial engineering student, is working on a homework problem for Engineering Economy. He needs to
Question:
Ivan, an industrial engineering student, is working on a homework problem for Engineering Economy. He needs to calculate the PW at 12 percent of a cash flow series with \(\$ 1,000\) at \(t=3, \$ 1,500\) at \(t=4\), and \(\$ 2,000\) at \(t=5\). If Ivan uses the equation \(P=1,000(P \mid A 12 \%, 3)+\) \(500(P \mid G 12 \%, 3)\), where is the \(P\) now located?
a. \(t=4\)
b. \(t=2\)
c. \(t=1\)
d. \(t=0\)
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Principles Of Engineering Economic Analysis
ISBN: 9781118163832
6th Edition
Authors: John A. White, Kenneth E. Case, David B. Pratt
Question Posted: