The following are costs incurred on Erath lease: REQUIRED: Treat each of the following independently: a. A

Question:

The following are costs incurred on Erath lease:

image text in transcribed

REQUIRED: Treat each of the following independently:

a. A fourth well, an exploratory well, was drilled at a cost of $2,010,000 and was determined to be dry. Give the entry to record the dry hole.

b. Give the entry to record abandonment of Well 2. Equipment costing $50,000 was salvaged. Accumulated DD&A on wells and equipment was $5,000,000.

Wells 1 and 3 are still producing.

c. Give the entry to record abandonment of the entire Erath lease. Assume the lease constituted a separate amortization base with accumulated DD&A on leasehold costs of $40,000 and accumulated DD&A on wells and equipment of $5,000,000.

d. Give the entry to record abandonment of the entire Erath lease, assuming instead that amortization had been computed on a field-wide basis with accumulated DD&A on leasehold costs of $300,000 and accumulated DD&A on wells and equipment of $18,000,000.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  answer-question
Question Posted: