A private energy supplier wants to estimate the monthly electricity utilization bill of a household in metro

Question:

A private energy supplier wants to estimate the monthly electricity utilization bill of a household in metro cities. Based on the reports published by the other suppliers, the standard deviation was found to be $20. The company wants to estimate the average monthly bill with 95% confidence level, assuming the maximum acceptable variation of $5.

a. Determine the sample size the company should be studying.

b. Will the sample size change if confidence level changes to 99%?