An area of an interconnected power system has two fossil-fuel units operating on economic dispatch. P 1
Fantastic news! We've Found the answer you've been seeking!
Question:
An area of an interconnected power system has two fossil-fuel units operating on economic dispatch. P 1 and P 2 are in megawatts (MW). The total load demand PD = 900 MW The variable operating costs of these units are given by
The transmission losses are given by
When the system incremental operating cost ?= 16 $/MWh, Determine the economic dispatch of the generation units total transmission losses, the penalization factor of bus 2.
Related Book For
Posted Date: