A famous tailor of Kimonos for sumo wrestlers uses 50 meters of a special silk each...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
A famous tailor of Kimonos for sumo wrestlers uses 50 meters of a special silk each week. This is expensive material, and the cost is 16.250 yen per meter. The silk supplier has a lead time of 2 weeks and the ordering cost are estimated to be 200,000 yen per order due to special processing and inspections. The inventory holding rate is 40% due to high insurance, taxes, and loss of material costs. They currently order using EOQ. • The supplier is offering a discounted price of 15,800 yen per meter if the order size is of 700 meters. The costs per order increase to 250,000 yen and the lead time increases to 3 weeks. • The supplier is offering a discounted price of 14,800 yen per meter if they order once a year. The costs per order increase to 300,000 yen and the lead time increases to 5 weeks. Assume 52 weeks per year. Answer the following: 1. What are the total costs under the current policy and the two discount options? 2. What is the recommend inventory policy? Qopt = 2xSxD CXH R=PXL AHCC x H x Q/2 AOC = SXD/Q APC D x C TC AHC + AOC + APC A famous tailor of Kimonos for sumo wrestlers uses 50 meters of a special silk each week. This is expensive material, and the cost is 16.250 yen per meter. The silk supplier has a lead time of 2 weeks and the ordering cost are estimated to be 200,000 yen per order due to special processing and inspections. The inventory holding rate is 40% due to high insurance, taxes, and loss of material costs. They currently order using EOQ. • The supplier is offering a discounted price of 15,800 yen per meter if the order size is of 700 meters. The costs per order increase to 250,000 yen and the lead time increases to 3 weeks. • The supplier is offering a discounted price of 14,800 yen per meter if they order once a year. The costs per order increase to 300,000 yen and the lead time increases to 5 weeks. Assume 52 weeks per year. Answer the following: 1. What are the total costs under the current policy and the two discount options? 2. What is the recommend inventory policy? Qopt = 2xSxD CXH R=PXL AHCC x H x Q/2 AOC = SXD/Q APC D x C TC AHC + AOC + APC
Expert Answer:
Answer rating: 100% (QA)
Given information Weekly usage 50 meters Cost per meter 16250 yen Lead time 2 weeks current policy Total costs under the current policy and the two discount options a Current Policy Ordering cost per ... View the full answer
Related Book For
Posted Date:
Students also viewed these general management questions
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
Read the case study "Southwest Airlines," found in Part 2 of your textbook. Review the "Guide to Case Analysis" found on pp. CA1 - CA11 of your textbook. (This guide follows the last case in the...
-
Mariposa Family Adventure Farms Ltd. (Mariposa) has been owned and operated by the Mariposa family for 35 years and specializes in offering family activities at their 100 acre farm, located just...
-
Consider an asset allocation problem with one risky asset and one risk-free asset .There are four investors .Each investor maximizes a mean-variance utility function to make their optimal investment...
-
In the 1991 World Track and Field Championships in Tokyo, Mike Powell jumped 8.95 m, breaking by a full 5 cm the 23-year long-jump record set by Bob Beamon. Assume that Powell's speed on takeoff was...
-
In a quick-return motion mechanism of the oscillating link type, the distance between the fixed centres is 80mm and the length of the driving crank is 20 mm. Determine the time ratio of the working...
-
Provide an example of a known liability, an estimated liability, and a contingent liability.
-
The owner of Showtime Movie Theaters, Inc., would like to estimate weekly gross revenue as a function of advertising expenditures. Historical data for a sample of eight weeks follow. a. Develop an...
-
Read this article: https://www.foxnews.com/us/be-honest-are-you-the-office-bully read the article Be Honest: Are You the Office Bully? or copy and paste the following link into your search engine....
-
Maximum Streak A project manager wants to look at employee attendance data. Given that m employees are working on the project, and the manager has the record of the employees present on n days of the...
-
Create a generic class for sorting data (numeric and non-numeric). Test data will include integer, float and strings. Numeric data (integer and float) should be sorted in descending order. Strings...
-
What path would you follow if you fell off a rotating merry-go-round? What force prevents you from following that path while youre on the merry-go-round?
-
What is the limit order book?
-
Define average collection period. How is it used to monitor a firms accounts receivable?
-
Why do firms hold marketable securities portfolios?
-
Describe the features of a line of credit.
-
Using buddy system, the 1MB memory is divided to 7 partitions as follows: All numbers are in KB. A (used) 16 13632 64 B (not used) 16 D C D (used) (not used) 32 64 8 (used) 128 The following requests...
-
Assessing simultaneous changes in CVP relationships Braun Corporation sells hammocks; variable costs are $75 each, and the hammocks are sold for $125 each. Braun incurs $240,000 of fixed operating...
-
(a) Show that x3 - (a2 + b2 + c2)x - 2 abc has real roots by considering A. (b) Show that a2 + b2 + c2 ¥ ab + ac + be by considering B. Let c a b b c 0 b c a
-
Find a unit vector in the direction of: [-2 -1 2]T
-
(a) Show that X and Y are orthogonal in Rn if and only if || X + Y || = ||X - Y||. (b) Show that X + Y and X - Y are orthogonal in Rn if and only if || X || = || Y ||.
-
What is a wave equation? What is a traveling-wave solution?
-
Fill in the Blank. In the wave-solution \(w(x, t)=w_{1}(x-c t)+w_{2}(x+c t)\), the first term represents the wave that propagates in the __________ directions of \(x\). conditions
-
Find the time it takes for a transverse wave to travel along a transmission line from one tower to another one \(300 \mathrm{~m}\) away. Assume the horizontal component of the cable tension as 30,000...
Study smarter with the SolutionInn App