CASE The Casual Furniture Company The Casual Furniture Company (CFC) makes a variety of bookshelves for...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
CASE The Casual Furniture Company The Casual Furniture Company (CFC) makes a variety of bookshelves for homes and businesses. The shelves come in various heights, widths, materials, and finishes. Effective requirements planning is essential for CFC's performance, and it uses MRP for planning. The MPS and MRP records are shown for one of CFC's products, part number 4 x3-01, a four-foot-high and three-foot-wide standard depth oak bookshelf. The BOM as a product structure diagram is shown in Figure 14-18. FIGURE 14-18 Bookshelf 43-01 BOM Back (1) FIGURE 14-19 MPS Bookshelf 4 x 3-01 Hem MPS Oak Sheet (1) Oak Sheet (1) Oak Sheet (1) Lot szere Lead time Week 1 Available inventory Safety stock CFC uses one-week time buckets and a planning horizon of eight weeks. The MPS for the 4x3-01 Bookshelf is shown in 2 Figure 14-19. 70 Cabinet (1) Side (2) FIGURE 14-20 Component Lot Size and Inventory Information 14L 0 0 Week 2 70 0 Bookshelf 4x3-01 Cabinet Back LAL LAL 2 weeks Tweek 120 100 D FIGURE 14-21 Cutting Department Processing Time 0 Component Back Side End Shelf Questions 1. Develop the MRP for all of the components. End (2) The cabinets are built in the cabinet assembly department and the shelves, backs, sides, and ends are made in the cutting department. The component lot size, lead time, available inventory and safety stock are shown in Figure 14-20. Two associates work in the cutting department, making the available capacity 80 hours per week, without overtime. The processing time for each component in the cutting department is shown in Figure 14-21. 4x3-01 Bookshelf Part Name: Bookshelf 4 x 3-01 Week Week Week Week 3 4 5 6 80 Side LAL 1 week 200 0 90 End Shelf (3) Oak Sheet (1) LA 1 week 200 0 60 Shelf FOO-500 1 week 300 80 G Bracket (4) Week Week 7 8 Bracket FOO-600 1 week 0 D Processing Time (minutes/part) 10 minutes 8 minutes. 5 minutes 7 minutes 80 70 Oak Sheet FOQ-1,000 2 weeks 500 30 Page 515 2. During week 1 of the plan, the bracket supplier notifies CFC that the order for 600 units will not arrive as planned. Instead, 300 will arrive this week and 300 will arrive next week, instead of all 600 arriving at the same time. Will this affect production and, if so, to what extent? 3. Now that the plan has been developed, is it feasible to consider the capacity of the cutting department? What recommendations do you have? 4. If you could change the lead times or lot-sizing policies used for any of the components, what changes would you make? Why? I 10 CASE The Casual Furniture Company The Casual Furniture Company (CFC) makes a variety of bookshelves for homes and businesses. The shelves come in various heights, widths, materials, and finishes. Effective requirements planning is essential for CFC's performance, and it uses MRP for planning. The MPS and MRP records are shown for one of CFC's products, part number 4 x3-01, a four-foot-high and three-foot-wide standard depth oak bookshelf. The BOM as a product structure diagram is shown in Figure 14-18. FIGURE 14-18 Bookshelf 43-01 BOM Back (1) FIGURE 14-19 MPS Bookshelf 4 x 3-01 Hem MPS Oak Sheet (1) Oak Sheet (1) Oak Sheet (1) Lot szere Lead time Week 1 Available inventory Safety stock CFC uses one-week time buckets and a planning horizon of eight weeks. The MPS for the 4x3-01 Bookshelf is shown in 2 Figure 14-19. 70 Cabinet (1) Side (2) FIGURE 14-20 Component Lot Size and Inventory Information 14L 0 0 Week 2 70 0 Bookshelf 4x3-01 Cabinet Back LAL LAL 2 weeks Tweek 120 100 D FIGURE 14-21 Cutting Department Processing Time 0 Component Back Side End Shelf Questions 1. Develop the MRP for all of the components. End (2) The cabinets are built in the cabinet assembly department and the shelves, backs, sides, and ends are made in the cutting department. The component lot size, lead time, available inventory and safety stock are shown in Figure 14-20. Two associates work in the cutting department, making the available capacity 80 hours per week, without overtime. The processing time for each component in the cutting department is shown in Figure 14-21. 4x3-01 Bookshelf Part Name: Bookshelf 4 x 3-01 Week Week Week Week 3 4 5 6 80 Side LAL 1 week 200 0 90 End Shelf (3) Oak Sheet (1) LA 1 week 200 0 60 Shelf FOO-500 1 week 300 80 G Bracket (4) Week Week 7 8 Bracket FOO-600 1 week 0 D Processing Time (minutes/part) 10 minutes 8 minutes. 5 minutes 7 minutes 80 70 Oak Sheet FOQ-1,000 2 weeks 500 30 Page 515 2. During week 1 of the plan, the bracket supplier notifies CFC that the order for 600 units will not arrive as planned. Instead, 300 will arrive this week and 300 will arrive next week, instead of all 600 arriving at the same time. Will this affect production and, if so, to what extent? 3. Now that the plan has been developed, is it feasible to consider the capacity of the cutting department? What recommendations do you have? 4. If you could change the lead times or lot-sizing policies used for any of the components, what changes would you make? Why? I 10
Expert Answer:
Answer rating: 100% (QA)
Answer1 Step1 MRP is an information system that turns master schedule requirements for final goods i... View the full answer
Related Book For
Managerial accounting
ISBN: 978-0471467854
1st edition
Authors: ramji balakrishnan, k. s i varamakrishnan, Geoffrey b. sprin
Posted Date:
Students also viewed these accounting questions
-
A chocolate manufacturer makes a variety of chocolate products including large chocolate bars (340 grams) and boxes of six smaller chocolate bars (170 grams in total). a. Specification for a large...
-
Acme Manufacturing makes a variety of household appliances at a single manufacturing facility. The expected demand for one of these appliances during the next four months is shown in the following...
-
Mariah Enterprises makes a variety of consumer electronic products. Its camera manufacturing plant is considering choosing between two different processes, named Alpha and Beta, which can be used to...
-
On January 2, 2013, Parker Corporation invests in the stock of Quarry Corporation. Quarry's book value is $4 million and its assets and liabilities are fairly reported. Quarry reports income of $3...
-
Credit Card Sales A local fast-food store is considering accepting major credit cards in its outlets. Current annual sales are $800,000 per outlet. The company can purchase the equipment needed to...
-
Discuss the need for rights amplification in Hydra. How does this practice compare with the cross-ring calls in a ring protection scheme?
-
Graph \(B\) Draw a minimum spanning tree for the given graph, and calculate its weight. 100 2.9 1.7 1.2 4 0 0 * d 30 3.1 3.5 4.3 40 Graph A Graph B Graph C Graph D
-
Cardinals Corporation purchased a computer on December 31, 2013, for $105,000, paying $30,000 down and agreeing to pay the balance in five equal installments of $15,000 payable each December 31...
-
Vulcan Flyovers offers scenic overflights of Mount Saint Helens. Data concerning the company's operations in July appear below: The company measures its activity in terms of flights. Customers can...
-
The proposed rates were not in the range the CEO expected given the pricing analysis. The CEO has asked the pricing actuary to verify the total projected loss cost excluding potential large storm...
-
Warranty Liability and Taxable Income Carrot Company has been profitable in the past and expects to remain profitable in the future. Carrot sells a product for which it provides a 5-year warranty....
-
A bond matures in 4 years and pays a 5 . 0 0 % annual coupon. The bond has a face value of $ 1 , 0 0 0 and currently sells for $ 9 7 0 . What is the bonds current yield?
-
Hi Expert, Please help me with providing a html, css and (if needed) Java script code for the desing below. Requirement: - I need the design to exactly be as the pic below - When hovering with the...
-
4. (8 points) Determine if each of the integrals below is an improper integral. If it is not improper, just write not improper. If it is improper, write it as a limit or sum of limits. Do not...
-
Lou Barlow, a divisional manager for Sage Company, has an opportunity to manufacture and sell one of two new products for a five- year period. His annual pay raises are determined by his division's...
-
Q.No.4. The Kuli Khan Company has the following shareholders' equity account: Common stock (Rs. 24 par value) Additional paid-in capital Retained earnings Total shareholders' equity The current...
-
Dave's Sporting Goods sells Mountain Mouse freeze-dried meals. Dave's uses a continuous review system to manage meal inventories. Suppose Mountan Mcuse offers the following volume discounts to its cus
-
Describe the Operations (+,,*,/) that can cause negligible addition (NA), error magnification (EM), or subtractive cancellation (SC) in calculating ?((x^2)+1) - x . Give the range of where they might...
-
What is the formula for reconciling income reported under variable costing with income reported under absorption costing?
-
When calculating equivalent units, we assume that cost is proportional to work done. Why does this assumption make sense?
-
Mark Ahren is an award-winning potter whose primary products are custom-designed cups and mugs in unique shapes. Mark estimates that the variable costs (clay bisque, pigments, glaze, and so on) are...
-
Distinguish between Maximax, Maximin, and Minimax regret decision-making models. Ex- plain why the attitude of the decision maker towards risk taking influences which model he/she would be...
-
Discuss the assumptions underlying probabilistic cost-volume-profit analysis.
-
Explain the reasons why overproducing a good may lead to real costs. How does un- derproducing a good differ from overproducing? Discuss the nature of the costs involved.
Study smarter with the SolutionInn App