D-Solar, a German manufacturer of solar panels, sells its products primarily in Europe. Demand in the...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
D-Solar, a German manufacturer of solar panels, sells its products primarily in Europe. Demand in the Europe market is currently 100,000 panels per year, and each panel sells for €50. Although panel demand is expected to grow, there are some downside risks if the economy slides. From one year to the next, demand may increase by 10 percent, with probability 0.7, or decrease by 10 percent, with probability 0.3. D-Solar has to decide whether to build a plant in Europe or China. In either case, D- Solar plans to build a plant with a rated capacity of 120,000 panels. The fixed and variable costs of the two plants are shown in Table 1. Observe that the fixed costs are given per year rather than as a one-time investment. The European plant is more expensive but has greater volume flexibility. The plant is able to increase or decrease production anywhere in the range of 50,000 to 120,000 panels while maintaining its variable cost. In contrast, the Chinese plant is cheaper (at the current exchange rate of 10 yuan/euro) but has limited volume flexibility and can produce only between 110,000 and 130,000 panels. If the Chinese plant is built, D-Solar will incur variable cost for 110,000 panels even if demand drops below that level and will lose sales if demand increases above 130,000 panels. Exchange rates are volatile; each year, the yuan is expected to rise 5 percent, with a probability of 0.7, or drop 5 percent, with a probability of 0.3. We assume that the sourcing decision will be in place over the next three years and the discount rate is ignored. All costs and revenues are assumed to accrue at the beginning of the year, allowing us to consider the first year as period 0 and the following two years as periods 1 and 2. Table 1: Fixed and Variable Costs European Plant Chinese Plant Variable Cost (euro) Fixed Cost (yuan) 10 million/year Variable Cost (yuan) Fixed Cost (euro) 2 million /year 50/panel 400/panel a) Construct the decision tree spanning periods 0,1,2. Show Demand and exchange rates inside each node of the tree. b) Compute the onshore (Europe) and the offshore (China) profit of one node (show on the decision tree which node you choose) in period 2 only. D-Solar, a German manufacturer of solar panels, sells its products primarily in Europe. Demand in the Europe market is currently 100,000 panels per year, and each panel sells for €50. Although panel demand is expected to grow, there are some downside risks if the economy slides. From one year to the next, demand may increase by 10 percent, with probability 0.7, or decrease by 10 percent, with probability 0.3. D-Solar has to decide whether to build a plant in Europe or China. In either case, D- Solar plans to build a plant with a rated capacity of 120,000 panels. The fixed and variable costs of the two plants are shown in Table 1. Observe that the fixed costs are given per year rather than as a one-time investment. The European plant is more expensive but has greater volume flexibility. The plant is able to increase or decrease production anywhere in the range of 50,000 to 120,000 panels while maintaining its variable cost. In contrast, the Chinese plant is cheaper (at the current exchange rate of 10 yuan/euro) but has limited volume flexibility and can produce only between 110,000 and 130,000 panels. If the Chinese plant is built, D-Solar will incur variable cost for 110,000 panels even if demand drops below that level and will lose sales if demand increases above 130,000 panels. Exchange rates are volatile; each year, the yuan is expected to rise 5 percent, with a probability of 0.7, or drop 5 percent, with a probability of 0.3. We assume that the sourcing decision will be in place over the next three years and the discount rate is ignored. All costs and revenues are assumed to accrue at the beginning of the year, allowing us to consider the first year as period 0 and the following two years as periods 1 and 2. Table 1: Fixed and Variable Costs European Plant Chinese Plant Variable Cost (euro) Fixed Cost (yuan) 10 million/year Variable Cost (yuan) Fixed Cost (euro) 2 million /year 50/panel 400/panel a) Construct the decision tree spanning periods 0,1,2. Show Demand and exchange rates inside each node of the tree. b) Compute the onshore (Europe) and the offshore (China) profit of one node (show on the decision tree which node you choose) in period 2 only.
Expert Answer:
Related Book For
Operations Management Managing Global Supply Chains
ISBN: 978-1506302935
1st edition
Authors: Ray R. Venkataraman, Jeffrey K. Pinto
Posted Date:
Students also viewed these law questions
-
In mid-2008, Fresenius, a German manufacturer of dialysis equipment, acquired APP Pharmaceuticals for $4.6 billion. The deal includes an earn-out, under which Fresenius will pay as much as $970...
-
Assume the money market is currently in equilibrium, as shown in the graph below. a. Suppose the economy experiences an Increase in the amount of nominal GDP. b. When nominal GDP increases, the_____...
-
Two 3 6-Ã ft plywood panels each weighing 30 lb are nailed together as shown. The panels are supported by ball-and-socket joints at A and F and by the wire BH. Determine (a) The location of H...
-
Evaluate and simplify the following derivatives. d dw -(e-w In w)
-
Refer to E6.17. If Kallsen gives customers who pay within the month of sale a 2 percent discount, does this change your answer? Why?
-
A child psychologist observed 8-year-old children behind a one-way mirror to determine how long they would play with a toy medical kit. The company that designed the toy was attempting to determine...
-
Water flows in a 10-ft-wide rectangular channel with a flowrate of \(200 \mathrm{ft}^{3} / \mathrm{s}\). Plot the specific energy diagram for this flow. Determine the two possible flowrates when the...
-
There are four radio stations in Midland. The stations have different formats (hard rock, classical, country/western, and easy listening), but each is concerned with the number of minutes of music...
-
How can HRMs use metrics to measure the success of the recruiting and selection processes? List 3 metrics that you view as most relevant.
-
Pro-Craft Company computed the following activity rates to allocate overhead cost for the year. Activity Materials handling Quality inspection Activity Rate $ 65 per materials requisition $ 55 per...
-
Trace the bottom-up tabulation Rod Cutting algorithm (below) on the following input: the following input: p[1..5] = 1, 5, 8, 9, 10 and n = 10. Draw the resulting table r[] (which stores the maximum...
-
True Or False An employer cannot be held liable for the negligence of an independent contractor even if they are negligent in hiring that person or fail to inspect the work of that person.
-
The Communications Decency Act (CDA) a. was created in 1966. b. removes liability for ISPs as publishers. c. removes liability for ISPs as distributors. d. none of the above.
-
The four torts of invasion of privacy are ____________, ______________, _______________, and ____________.
-
True Or False A statement implying undisclosed facts may not be defamatory if it is an opinion.
-
Under what conditions does respondeat superior apply, and when does it not apply?
-
i. Write the addressing mode and find the physical address for the following instruction of 8086 microprocessor. The contents of different registers are given below: AX= 1000H, BX = 2000H, S1 =...
-
Describe the Operations (+,,*,/) that can cause negligible addition (NA), error magnification (EM), or subtractive cancellation (SC) in calculating ?((x^2)+1) - x . Give the range of where they might...
-
J & K Timber Supply Company ships oak flooring from three of its mills in Jodhpur, Bhopal, and Nagpur to three warehouses in Chennai, New Delhi, and Chandigarh. Shipping costs in $ per ton, mill...
-
Cool Air Inc. currently manufactures room air conditioners in its Chicago and Baton Rouge plants. The company ships its air conditioners to three warehouses in Boston, Tucson, and Denver. As a result...
-
Why is it necessary to manage, at the strategic level, the performance of your suppliers?
-
A prototype can be ___________. (a) Complete system with partial requirements (b) Working model (c) Full-fledged system (d) All of these
-
_____________ is also used as requirement finding and feasibility testing tool. (a) Prototype (b) Reports (c) System (d) Procedure
-
Which of the following systems development approach is adopted if information requirements are not well defined? (a) SDLC (b) Prototype (c) Structured approach (d) Agile
Study smarter with the SolutionInn App