Explain the operation of the given block diagram of Process Control System. Manipulated variable Z- Control signal
Fantastic news! We've Found the answer you've been seeking!
Question:
Explain the operation of the given block diagram of Process Control System.
Transcribed Image Text:
Manipulated variable Z- Control signal Control element Set point Controller Input Error signal Feedback signal Process Comparator Output Variable amplitude Measuring element Controlled variable Manipulated variable Z- Control signal Control element Set point Controller Input Error signal Feedback signal Process Comparator Output Variable amplitude Measuring element Controlled variable
Expert Answer:
Answer rating: 100% (QA)
Components and Signal Flow Set Point This block represents the desired value for the controlled variable which in this case is labeled as Amplitude It... View the full answer
Related Book For
Posted Date:
Students also viewed these operating system questions
-
In Problem 67, Chapter 7 (Figure P7.31), the block diagram of a cascade scheme for the speed control of an HEV (Preitl, 2007) was represented as a unity feedback system. In that diagram the output of...
-
Power Company manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $432,000 payroll for 4,800 direct labor-hours. Listed below is cost...
-
Implement the queue data structure using arrays of size 10 with the following functions Enqueue () - add {2,3,4,5,6,7,8} to the queue Dequeue() - remove 2 elements isFull() - check if the queue is...
-
According to a Harris Interactive (July 2013) poll of U.S. adults, about 60% work during their summer vacation. Assume that the true proportion of all U.S. adults who work during summer vacation is p...
-
Part A Baker, Strong, and Weak have called on you to assist them in winding up the affairs of their partnership. You are able to gather the following information. 1. The trial balance of the...
-
Consider a 10-year zero-coupon bond with face value \(\$ 100\). The interest rate is fixed at 5\%. The credit spread for the bond is estimated to be \(1 \%\) (except in part (a)). Calculate: (a) The...
-
On January 1, 2006, Mason Co. entered into a 12-year lease on a building. The lease contract requires (1) annual (prepaid) rental payments of $ 36,000 each January 1 throughout the life of the lease...
-
What role do institutions and governance systems play in fostering an environment conducive to empowerment, and how can these structures be reimagined to better serve marginalized populations ?
-
Complete Form 941 for the 4th quarter for TCLH Industries (which is located at 202 Whitmore Avenue, Durham, NC 27701; Employer Identification #44-4444444). Assume that all necessary deposits were...
-
Your client purchased some last-minute materials for a job. They didn't have time to record the expense in QuickBooks Online, and now the corresponding payment has appeared in their bank feed. Can...
-
In 2014, Air Asia Flight No. 8501 crashed in the Java Sea while flying from Indonesia to Singapore. The crash resulted in the deaths of all passengers and crew on board. The plane involved in the...
-
Petitioner Atlantic Marine Company was a contractor located in Virginia. It entered into a subcontract with J-Crew Management, Inc., a Texas corporation, that contained a forum-selection clause...
-
Petitioner Curtis Flowers has been tried six separate times for the murder of four employees of a Mississippi furniture store. Flowers is black; three of the four victims were white. At the first two...
-
According to the Supreme Court decision in Quill Corp. v. North Dakota, a state may not require a retailer with no physical presence in the state to collect and remit sales tax on sales made in the...
-
What are some of the nonverbal clues to deception?
-
3) Determine whether the given series converges or diverges. 4n + 3n + 1 D [7 pts.] 2n -n ii) (8 pts. ] Cos nin il) (10 pts.]
-
A 6-lb shell moving with a velocity ?? v0k explodes at point D into three fragments which hit the vertical wall at the points indicated. Fragments A, B, and C hit the wall 0.010 s, 0.018 s, and 0.012...
-
Design an observer for represented in phase-variable form with a desired performance of 10% overshoot and a settling time of 0.5 second. The observer will be 10 times as fast as the plant, and the...
-
Find the transfer function G(s) = Y(s)=R(s) for each of the following systems represented in state space: a) b) c) 07 0 0 1x+ -3 -2 -5 10 y = [1 0 0]x
-
Name the performance specification for first-order systems.
-
A project under consideration has a 10-year projected life. The initial investment for the project is estimated to have a mean of \(\$ 10,000\) and a standard deviation of \(\$ 1,000\). The annual...
-
True or False: In determining the optimum replacement interval, it is necessary to assume negligible salvage values.
-
Uncertainty can impact many elements of an engineering economic analysis. Given the list of factors below, rank them from most to least uncertain, and briefly justify why you ranked them in that...
Study smarter with the SolutionInn App