In a construction windows and doors are two consecutive jobs each of which can be done...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
In a construction "windows" and "doors" are two consecutive jobs each of which can be done at 3 different speeds. According to the speed chosen, the probabilities of both the cost and the time of completion is change. If the two jobs are not completed in 10 months, the contractor has to pay a fine of 500 Million monthly. The contractor has prepared the following table depending on his earlier experience. JOB SPEED COST (MILLION WINDOWS DOOR THE THE THE MONTHLY PROBABILITY PROBABILITY PROBABILITY OF COMPLETION COMPLETION IN 5 MONHS IN 6 MONHS 0,5 0,3 0,6 0,1 0,4 0 0,4 0,4 0,3 A 400 B 500 C 600 UD COMPLETION IN 4 MONHS 0,2 0,3 0,6 200 0,1 E 300 0,3 F 400 0,6 0,5 0,3 0,1 a) Calculate the expected (mean) value of the cost for different speeds. b) Calculate the expected value of total cost. (First, calculate the probability of completion in 11 months, second, the probability of completion in 12 months, third, the expected value of construction cost to be paid, fourth, the expected value of fine to be paid, and finally the expected value of total cost.) In a construction "windows" and "doors" are two consecutive jobs each of which can be done at 3 different speeds. According to the speed chosen, the probabilities of both the cost and the time of completion is change. If the two jobs are not completed in 10 months, the contractor has to pay a fine of 500 Million monthly. The contractor has prepared the following table depending on his earlier experience. JOB SPEED COST (MILLION WINDOWS DOOR THE THE THE MONTHLY PROBABILITY PROBABILITY PROBABILITY OF COMPLETION COMPLETION IN 5 MONHS IN 6 MONHS 0,5 0,3 0,6 0,1 0,4 0 0,4 0,4 0,3 A 400 B 500 C 600 UD COMPLETION IN 4 MONHS 0,2 0,3 0,6 200 0,1 E 300 0,3 F 400 0,6 0,5 0,3 0,1 a) Calculate the expected (mean) value of the cost for different speeds. b) Calculate the expected value of total cost. (First, calculate the probability of completion in 11 months, second, the probability of completion in 12 months, third, the expected value of construction cost to be paid, fourth, the expected value of fine to be paid, and finally the expected value of total cost.)
Expert Answer:
Related Book For
Introduction to Operations Research
ISBN: 978-1259162985
10th edition
Authors: Frederick S. Hillier, Gerald J. Lieberman
Posted Date:
Students also viewed these programming questions
-
can someone solve this Modern workstations typically have memory systems that incorporate two or three levels of caching. Explain why they are designed like this. [4 marks] In order to investigate...
-
Carol Harris, Ph.D, CPA, is a single taxpayer and she lives at 674 Yankee Street, Durham, NC 27409. Her Social Security number is 793-52-4335. Carol is an Associate Professor of Accounting at a local...
-
The pilot of a small boat charts a course such that the boat will always be equidistant from an upcoming rock and the shoreline. Describe the path of the boat. If the rock is 2 miles offshore, write...
-
You hold $2,000 as a customer deposit, but the customer wants to make sure he does not loose on the opportunity cost of those dollars. You agree to pay the customer 10% interest during the holding...
-
Ravonette Corporation issued 300 shares of $10 par value ordinary shares and 100 shares of $50 par value preference shares for a lump sum of $13,500. The ordinary shares have a market price of $20...
-
Verify by direct substitution that the functions \(r^{n} \cos (n \theta)\) etc. shown in the text satisfy the Laplace equation in polar coordinates. Calculate the streamfunction for the...
-
Check the fundamental theorem for gradients, using T = x2 + 4xy + 2yz3, the points a = (0, 0, 0), b = (1, 1, 1), and the three paths in Fig. 1.28:? (a) (0,0.0) ??? (1.0, 0) ??? (1, 1,0) ??? (1,...
-
10.21 Estimate the hydrogen-burning lifetimes of stars near the lower and upper ends of the main sequence. The lower end of the main sequence 2 occurs near 0.072 Mo, with log10 Te = 3.23 and log 10...
-
A hunter wanted to determine the muzzle velocity of a firearm and asked a PHYS 1101W student to help out. They drilled a hole in a table and placed a copy of College Physics by Knight, Jones and...
-
Refer to image shown. Decimal Places: 2 Use hand calculations, modeling is not necessary The "Shaft" carries a torque that induces a shear force in the "Bolts". Shear Stress in the 4 bolts (kN/m) s =...
-
Refer to image shown. Unit System: English (IPS) Decimal Places: 2 Use hand calculations, modeling is not necessary. L1 = 0.5 L2 = 0.2 = 45 F = 10 What is the reaction force magnitude (lbs) at the...
-
m The value pairs U = 0.96- for E= 3.388V and U = 2.4- for E = 3.810V second were read on the hot wire anemometer (probes). Find the value of the voltage shown in the figure m second m second read on...
-
A thin storage tank of inside diameter 2 m and length 4 m is used to store water at 10 MPa. Find the thickness of the tank, given that the hoop and the longitudinal stresses are limited to 300 Mpa...
-
(5pt) Hollow circular post ABC supports a compressive load P = 2100 lb. A second load P2 is uniformly applied to the cap plate at B, and can be treated as a single concentrated load of magnitude P2....
-
Which of these reactants will produce this product under this 3-step reaction? 1) Ph3P 2) NaOH Br .CI CI A) B) C) D)
-
A regular deposit of $100 is made at the beginning of each year for 20 years. Simple interest is calculated at i% per year for the 20 years. At the end of the 20-year period, the total interest in...
-
A contractor, Susan Meyer, has to haul gravel to three building sites. She can purchase as much as 18 tons at a gravel pit in the north of the city and 14 tons at one in the south. She needs 10, 5,...
-
Consider the following problem, where the value of k has not yet been ascertained. Maximize Z = x1 + 2x2, Subject to and x1 0, x2 0. The solution currently being used is x 1 = 2, x 2 = 3. Use...
-
Consider variation 3 of the political campaign problem (see table 15.6). refer to the resulting linear programming model for player 1 given near the end of sec. 15.5. ignoring the objective function...
-
A layer of water is flowing down a flat plate that is inclined at an angle of $20^{\circ}$ to the vertical. If the depth of the layer is $1 / 4 \mathrm{in}$., what is the shear stress exerted by the...
-
A slider bearing consists of a sleeve surrounding a cylindrical shaft that is free to move axially within the sleeve. A lubricant (e.g., grease) is in the gap between the shaft and the sleeve to...
-
By making use of the analogies between the various transport models for molecular transport of conserved quantities, describe how you would set up an experiment to solve each of the following...
Study smarter with the SolutionInn App