Moore Housing Contractors is negotiating a deal with Countryside Realtors to build six houses in a new develop- ment. Countryside wants Moore Contractors to start in late winter or early spring, when the weather begins to moder- ate, and build on through the summer and into the fall. The summer months are an especially busy time for the realty company, and it believes it can sell the houses almost as soon as they are ready, and maybe even before. The houses all have similar floor plans and are of approximately equal size; only the exteriors are noticeably different. The comple- tion time is so critical for Countryside Realtors that it is insisting that a project management network accompany the contractor's bid for the job, with an estimate of the comple tion time for a house. The realtor also needs to be able to plan its offerings and marketing for the summer. It wants each house to be completed within 45 days after it is started. If a house is not completed within this time frame, it wants to be able to charge the contractor a penalty. Mary and Sandy Moore, the president and vice president, respectively, of Moore Contractors, are concerned about the prospect of a penalty charge. They want to be very confident that they can meet the deadline for a house before they enter into any kind of agreement with a penalty involved. (If there is a reasonable likelihood that they cannot finish a house within 45 days, they want to increase their bid to cover potential penalty charges.) The Moores are experienced home builders, so it was not difficult for them to list the activities involved in build- ing a house or to estimate activity times. However, they made their estimates conservatively and tended to increase their pessimistic estimates to compensate for the possibility of bad weather and variations in their workforce. A list of the activities involved in building a house and the activity time estimates follow. Activity a b Activity Description Excavation, pour footers Lay foundation Activity Predecessor a Time (days) m b 3 4 6 a 2 3 5 c Frame and roof b 2 4 5 d Lay drain tiles b 1 2 4 e Sewer (floor) drains b 1 2 3 f Install insulation c 2 4 5 3 Pour basement floor e 2 3 5 h Rough plumbing, pipes e 2 4 7 i Install windows f 1 3 4 j Rough electrical wiring f 1 2 4 k Install furnace, air conditioner c.g 3 5 8 1 Exterior brickwork i 5 6 10 m Install plasterboard, mud, plaster j.h.k 6 8 12 n Roof shingles, flashing 1 2 3 6 0 Attach gutter, downspouts n 1 2 $ P Grading d, o 2 3 7 4 Lay subflooring m 3 4 6 T Lay driveway, walks, landscape P 4 6 10 S Finish carpentry 3 5 12 t Kitchen cabinetry, sink, and appliances 9 2 4 8 Bathroom cabinetry, fixtures 2 3 6 V Painting (interior and exterior) LU 4 6 10 W Finish wood floors, lay carpet V, 5 2 5 8 x Final electrical, light fixtures V 1 3 4 a. Develop a CPM/PERT network for Moore Housing Contractors and determine the probability that the company can complete a house within 45 days. Does it appear that the Moores might need to increase their bid to compensate for potential penalties? b. Indicate which project activities Moore Housing Contractors should be particularly diligent to keep on schedule by making sure workers and materials are always available. Also indicate which activities the company might shift workers from as the need arises. Moore Housing Contractors is negotiating a deal with Countryside Realtors to build six houses in a new develop- ment. Countryside wants Moore Contractors to start in late winter or early spring, when the weather begins to moder- ate, and build on through the summer and into the fall. The summer months are an especially busy time for the realty company, and it believes it can sell the houses almost as soon as they are ready, and maybe even before. The houses all have similar floor plans and are of approximately equal size; only the exteriors are noticeably different. The comple- tion time is so critical for Countryside Realtors that it is insisting that a project management network accompany the contractor's bid for the job, with an estimate of the comple tion time for a house. The realtor also needs to be able to plan its offerings and marketing for the summer. It wants each house to be completed within 45 days after it is started. If a house is not completed within this time frame, it wants to be able to charge the contractor a penalty. Mary and Sandy Moore, the president and vice president, respectively, of Moore Contractors, are concerned about the prospect of a penalty charge. They want to be very confident that they can meet the deadline for a house before they enter into any kind of agreement with a penalty involved. (If there is a reasonable likelihood that they cannot finish a house within 45 days, they want to increase their bid to cover potential penalty charges.) The Moores are experienced home builders, so it was not difficult for them to list the activities involved in build- ing a house or to estimate activity times. However, they made their estimates conservatively and tended to increase their pessimistic estimates to compensate for the possibility of bad weather and variations in their workforce. A list of the activities involved in building a house and the activity time estimates follow. Activity a b Activity Description Excavation, pour footers Lay foundation Activity Predecessor a Time (days) m b 3 4 6 a 2 3 5 c Frame and roof b 2 4 5 d Lay drain tiles b 1 2 4 e Sewer (floor) drains b 1 2 3 f Install insulation c 2 4 5 3 Pour basement floor e 2 3 5 h Rough plumbing, pipes e 2 4 7 i Install windows f 1 3 4 j Rough electrical wiring f 1 2 4 k Install furnace, air conditioner c.g 3 5 8 1 Exterior brickwork i 5 6 10 m Install plasterboard, mud, plaster j.h.k 6 8 12 n Roof shingles, flashing 1 2 3 6 0 Attach gutter, downspouts n 1 2 $ P Grading d, o 2 3 7 4 Lay subflooring m 3 4 6 T Lay driveway, walks, landscape P 4 6 10 S Finish carpentry 3 5 12 t Kitchen cabinetry, sink, and appliances 9 2 4 8 Bathroom cabinetry, fixtures 2 3 6 V Painting (interior and exterior) LU 4 6 10 W Finish wood floors, lay carpet V, 5 2 5 8 x Final electrical, light fixtures V 1 3 4 a. Develop a CPM/PERT network for Moore Housing Contractors and determine the probability that the company can complete a house within 45 days. Does it appear that the Moores might need to increase their bid to compensate for potential penalties? b. Indicate which project activities Moore Housing Contractors should be particularly diligent to keep on schedule by making sure workers and materials are always available. Also indicate which activities the company might shift workers from as the need arises.
Expert Answer:
Related Book For
Operations Management Creating Value Along the Supply Chain
ISBN: 978-0470525906
7th Edition
Authors: Roberta S. Russell, Bernard W. Taylor
Posted Date:
Students also viewed these general management questions
-
Moore Housing Contractors is negotiating a deal with Countryside Realtors to build six houses in a new development. Countryside wants Moore Contractors to start in late winter or early spring when...
-
1. Develop a CPM/PERT network for Moore House Contractors and determine the probability that the contractors can complete a house within 45 days. Does it appear that the Moores might need to increase...
-
What is the charge of the iron ion released upon dissolvingFe(NH 4 ) 2 (SO 4 ) 2 ?Remember the charges of the polyatomic ions NH 4 andSO 4 and that the entire compound will be chargeneutral. a). 8+...
-
1. What advantages and disadvantages would you see for Yang Toyland in signing the proposed contract with Gross-Versand. 2. What should be Y.C. 's objective in his discussion with Herr Clausen? 3....
-
Air is compressed from room conditions to a specified pressure in a reversible manner by two compressors: one isothermal and the other adiabatic. If the entropy change of air sisot during the...
-
Find an article that discusses ethics and the use of social media by paralegals.
-
Carl and Carol have salaries of $14,000 and $22,000, respectively. Their itemized deductions total $8,500. They are married and both are under age 65. a. Compute their taxable income assuming they...
-
3. [20 Marks] The account balances for ABC Ltd. are given below in the table. The balance are for a given financial year, but it is unadjusted. The data for adjustments are given below the table....
-
A steel shaft of diameter d and length I is fixed at one end and carries a propeller of mass m and mass moment of inertia Jo at the other end (see Figure below). Propeller; mass m, mass moment of...
-
Summarize at least three expectations of peons, or subordinate employees. These expectations may be listed in the employee handbook, or they may be unspoken expectations
-
You work for a Tele-Marketing firm that specializes in in-bound calls from consumers who have questions regarding their credit cards. You have been asked to create a customer satisfaction survey for...
-
Statement of Retained Earnings Night Scapes, Corporation began the year 2 0 1 8 with $ 2 8 million in retained earnings. The firm suffered a net loss of $ 2 . 8 million in 2 0 0 8 and yet paid $ 2 ....
-
You work in the restaurant of a sports club. It serves a variety of freshly cooked European and Asian dishes. One of the most popular dishes is charcoal-grilled steak served with double-fried,...
-
You are a public citizen concerned about a curvy mountain road that is frequently covered by black ice over the winter. A section of the road has a curve of radius 228 ft is banked at an angle of e....
-
In what ways does the profession of public relations serve the goals of election campaigns? In what ways can it impede those goals?
-
The first law of thermodynamics is sometimes whimsically stated as, You cant get something for nothing, and the second law as, You cant even break even. Explain how these statements could be...
-
Using the final model from Task 6, what are the probabilities that participants 12, 53 and 75 will use a condom? Task 6 An HIV researcher explored the factors that influenced condom use with a new...
-
At the start of the chapter we looked at whether the type of instrument a person plays is connected to their personality. A musicologist measured extroversion and agreeableness in 200 singers and...
-
Which problem associated with logistic regression might we have in the analysis in Task 10? Task 10 At the start of the chapter we looked at whether the type of instrument a person plays is connected...
Study smarter with the SolutionInn App