PART 1 Instructions a) Answer b and c using excel file b) Example 3 contains a process
Question:
PART 1
Instructions
a) Answer b and c using excel file
b) Example 3 contains a process where a single product is assembled. One component of the product goes through sawing and sanding and another goes through drilling. Then the two get welded at the welding station. After welding the product goes to one of the assembly stations (parallel stations) and exits the process. Which activity is the bottleneck in this process? What is the hourly capacity of the system. Complete the simulation in Example 3 for five products. Does the simulation confirm the bottleneck you identified?
c) In Example 3, if you want to increase the capacity by at least 20%, what kind of changes you need to do? What is the new capacity?
PART 2
Part 2 has 5 question – YOU only need to answer FOUR (choose 4 out of 5)
Question 1. The College at Brockport decided to build a new stadium. The job now was to get construction going immediately after the current season ended and finish the construction within 44 weeks. The details about the project are given below. Activity A B C D E F G H I J K L Description Bonding, insurance, tax structuring Foundation, concrete footings for boxes Upgrading skybox stadium seating Upgrading walkways, stairwells, elevators Interior wiring, lathes Inspection Approvals Plumbing Painting Hardware/AC/metal workings Tile/carpet/windows Inspection Final detail work/cleanup Predecessors A A C B E D, F G H H J I, K Duration (weeks) 5 9 8 ∞ ∞0 60 50 40 3 t 6 5 4 5 3 4 6 a) Create a network diagram for the project in Excel. b) Find the duration of the project using a table that contains ES, EF, LS, and LF values and identify the critical path. Which activities have a slack? c) Create a GANTT chart for the project in Excel. d) Can they finish the project within 44 weeks? If not, what would you recommend them? Provide a brief discussion. Question 2. Consider the assembly line below. The process is run in batches. The three fabrication operations run in parallel, such that each batch only needs to go through one of the three fabrication operations. After that, each batch needs to go through one of the assembly operations that run in parallel. The units are packaged and made ready for shipment in the final stage. Fabrication 15 min/batch Fabrication 15 min/batch Fabrication 15 min/batch Assembly 12 min/batch Assembly 12 min/batch Packaging 5 min/batch a) Simulate the process for five consecutive batches. Assume that the process is free of any work in process inventory at the beginning. b) What is the throughput time of the process? c) Which activity is the bottleneck and what is the bottleneck time (flow time)? d) Explain the difference between the flow time and the throughput time in a short paragraph. e) Find the hourly capacity of the process and calculate the utilization of each fabrication operation. Question 3. The local New York DMV office issues new licenses and renews licenses. (See the diagram below.) The office receives 150 customers per hour. All customers see a receptionist first. The receptionist directs them in one of three directions: 75% go directly to issue license (staffed by 12 workers) where a new photo and license are done, 15% are required to take an eye test (staffed by two workers), and 10% must first take a multiple-choice electronic written test (on one of three computers). Only 85% of people pass the eye test and the remaining 15% exit. The customers who pass the eye test proceed to the written test where 10% of the people fail it, while 90% pass the test and proceed to issue license. Reception Eye Test 75% Reception Written Test Issue License. 10% 15% Eye Test 85% Written Test Workers 1 2 3 12 15% 10% Exit Data on each station are provided in the following table: 90% Exit Issue License Activity time per worker (min) 2 3 15 6 > Exit a) Find the implied utilization of each resource. b) If you add one more worker to the bottleneck resource, what would be the new implied utilization rates? Which resource becomes the new bottleneck? c) For which value of customer arrival rate per hour, the bottleneck station would have 100% utilization rate? Answer this question using the information given in the original question (without taking into account the change suggested in part (b). Question 4. Mr. Bean s is a very popular hair salon. It offers high-quality hair-styling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parenthesis): Activity 1: Welcome a guest and offer homemade herb tea. (10 minutes) Activity 2: Wash and condition hair. (10 minutes) Activity 3: Neck, shoulder, and back stress release massage. (10 minutes) Activity 4: Design the hairstyle and do the hair. (25 minutes) Activity 5: Check out the guest. (5 minutes) Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: SI does Activity 1. S2 does Activities 2 and Activity 3. S3 does Activities 4 and Activity 5. a) What is the flow rate of the process and the average labor utilization of the servers? Assume the process operates at its capacity. b) Assume a wage rate of $18 per hour. What is the cost of direct labor? The cost of direct labor is calculated as Total wages per unit of time divided by Flow Rate , c) To increase the service rate, Mr. Bean s is considering two alternatives: Alternative I: To hire a new employee to help any (and only one) of the servers without changing the tasks performed by each server. Alternative II: To redesign the assignment of tasks to servers. For this, Mr. Bean s is evaluating to reassign Activity 5 from $3 to Sl. Which alternative do you think will be better? Analyze it in Excel and come up with a conclusion. Question 5. Find a process in the How It s Made channel on YouTube and create a process flow diagram for the process. Explain the process flow and discuss where you think that the bottleneck may occur in this specific process. Alternatively, you can consider a process at your workplace. Question 1. The College at Brockport decided to build a new stadium. The job now was to get construction going immediately after the current season ended and finish the construction within 44 weeks. The details about the project are given below. Activity A B C D E F G H I J K L Description Bonding, insurance, tax structuring Foundation, concrete footings for boxes Upgrading skybox stadium seating Upgrading walkways, stairwells, elevators Interior wiring, lathes Inspection Approvals Plumbing Painting Hardware/AC/metal workings Tile/carpet/windows Inspection Final detail work/cleanup Predecessors A A C B E D, F G H H J I, K Duration (weeks) 5 9 8 ∞ ∞0 60 50 40 3 t 6 5 4 5 3 4 6 a) Create a network diagram for the project in Excel. b) Find the duration of the project using a table that contains ES, EF, LS, and LF values and identify the critical path. Which activities have a slack? c) Create a GANTT chart for the project in Excel. d) Can they finish the project within 44 weeks? If not, what would you recommend them? Provide a brief discussion. Question 2. Consider the assembly line below. The process is run in batches. The three fabrication operations run in parallel, such that each batch only needs to go through one of the three fabrication operations. After that, each batch needs to go through one of the assembly operations that run in parallel. The units are packaged and made ready for shipment in the final stage. Fabrication 15 min/batch Fabrication 15 min/batch Fabrication 15 min/batch Assembly 12 min/batch Assembly 12 min/batch Packaging 5 min/batch a) Simulate the process for five consecutive batches. Assume that the process is free of any work in process inventory at the beginning. b) What is the throughput time of the process? c) Which activity is the bottleneck and what is the bottleneck time (flow time)? d) Explain the difference between the flow time and the throughput time in a short paragraph. e) Find the hourly capacity of the process and calculate the utilization of each fabrication operation. Question 3. The local New York DMV office issues new licenses and renews licenses. (See the diagram below.) The office receives 150 customers per hour. All customers see a receptionist first. The receptionist directs them in one of three directions: 75% go directly to issue license (staffed by 12 workers) where a new photo and license are done, 15% are required to take an eye test (staffed by two workers), and 10% must first take a multiple-choice electronic written test (on one of three computers). Only 85% of people pass the eye test and the remaining 15% exit. The customers who pass the eye test proceed to the written test where 10% of the people fail it, while 90% pass the test and proceed to issue license. Reception Eye Test 75% Reception Written Test Issue License. 10% 15% Eye Test 85% Written Test Workers 1 2 3 12 15% 10% Exit Data on each station are provided in the following table: 90% Exit Issue License Activity time per worker (min) 2 3 15 6 > Exit a) Find the implied utilization of each resource. b) If you add one more worker to the bottleneck resource, what would be the new implied utilization rates? Which resource becomes the new bottleneck? c) For which value of customer arrival rate per hour, the bottleneck station would have 100% utilization rate? Answer this question using the information given in the original question (without taking into account the change suggested in part (b). Question 4. Mr. Bean s is a very popular hair salon. It offers high-quality hair-styling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parenthesis): Activity 1: Welcome a guest and offer homemade herb tea. (10 minutes) Activity 2: Wash and condition hair. (10 minutes) Activity 3: Neck, shoulder, and back stress release massage. (10 minutes) Activity 4: Design the hairstyle and do the hair. (25 minutes) Activity 5: Check out the guest. (5 minutes) Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: SI does Activity 1. S2 does Activities 2 and Activity 3. S3 does Activities 4 and Activity 5. a) What is the flow rate of the process and the average labor utilization of the servers? Assume the process operates at its capacity. b) Assume a wage rate of $18 per hour. What is the cost of direct labor? The cost of direct labor is calculated as Total wages per unit of time divided by Flow Rate , c) To increase the service rate, Mr. Bean s is considering two alternatives: Alternative I: To hire a new employee to help any (and only one) of the servers without changing the tasks performed by each server. Alternative II: To redesign the assignment of tasks to servers. For this, Mr. Bean s is evaluating to reassign Activity 5 from $3 to Sl. Which alternative do you think will be better? Analyze it in Excel and come up with a conclusion. Question 5. Find a process in the How It s Made channel on YouTube and create a process flow diagram for the process. Explain the process flow and discuss where you think that the bottleneck may occur in this specific process. Alternatively, you can consider a process at your workplace.
Expert Answer:
Question 1 Question 2 Simulation Through time of the process It defines the complete cycle a process has to undergo which is the time taken to complete the cycle In this simulation each fabrication co... View the full answer
Income Tax Fundamentals 2013
ISBN: 9781285586618
31st Edition
Authors: Gerald E. Whittenburg, Martha Altus Buller, Steven L Gill
Students also viewed these business writing questions
-
PART 1 Instructions a) Complete the Excel file b) Example 3 contains a process where a single product is assembled. One component of the product goes through sawing and sanding and another goes...
-
Planning is one of the most important management functions in any business. A front office managers first step in planning should involve determine the departments goals. Planning also includes...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
Two billiard balls of equal mass undergo a perfectly elastic head-on collision. If one balls initial speed was 2.00m/s, and the others was 3.00m/s in the opposite direction, what will be their speeds...
-
Southern Ontario Publishing Company is trying to decide whether to revise its popular textbook, Introduction to Corporate Finance. The company has estimated that the revision will cost $50,000. Cash...
-
Empty Fields Company pays its salaried employees monthly on the last day of each month. The annual salary payroll for 20-- follows. Compute the following for the payroll of December 31: OASDI Taxable...
-
During 2009, Newfoundland Corp. earned income from continuing operations of \(\$ 135,000\). The company also sold a segment of the business (discontinued operations) at a loss of \(\$ 30,000\) and...
-
CVP analysis is both simple and simplistic if you want realistic analysis to underpin your decisions, look beyond CVP analysis. Do you agree? Explain.
-
Read the sample of opening paragraphs from business letters below and then choose the most effective subject line for the letter. Opening Sentence: Please accept this letter as a reflection of my...
-
To foster the development of self-efficacy, parents and caretakers should: A. provide tasks which a child can easily achieve: B. structure tasks that are a challenge but with a high likelihood of...
-
Suppose you are the project manager in charge of research at a firm that has been contacted by the Sweet Briar College (SBC) research group. They have been extended the letter in the file titled...
-
An underfloor with a heating system is kept at a temperature of 35 C to heat up a room where the air is at 22 C. Using the proposed correlation below, determine the heat transfer coefficient between...
-
Question 1 - Capital structure Granby Biotech has no debt financing and an asset beta of 0.7. Assume a risk free rate of 5% and that the CAPM holds and the expected return on the market portfolio is...
-
As you know, the value of. It is defined as the ratio of the circumference of a circle C divided by its diameter 2r. That is x-C/2. a) Let's assume that you measured a circumference of a circle to be...
-
1. Julia saves $38 at the end of each week and deposits the money in an account paying 7% compounded monthly. How much will Julia accumulate in 6 years? How much of the accumulated amount is...
-
bank would you lend the company more money? If you were an investor would you consider investing more money in the company? Briefly explain your decisions. c. During January of 2024, the company had...
-
Directions Download Microtransit (Scooter and Ebike) Trips dataset https://data.kcmo.org/Transportation/Microtransit-Scooter-and-Ebike-Trips/dy5n-ewk5 Question (You can Use Tableau or any you like...
-
Access the Federation of Tax Administrators Internet site at www. taxadmin.org/state-tax-forms and indicate the titles of the following state tax forms and publications: a. Minnesota Form M-100 b....
-
Leslie and Leon Lazo are married and file a joint return for 2012. Leslie's Social Security number is 466-47-3311 and Leon's is 467-74-4451. They live at 143 Snapdragon Drive, Reno, NV 82102. For...
-
Frank, age 35, and Joyce, age 34, are married and file a joint income tax return for 2012. Their salaries for the year total $83,000 and they have taxable interest income of $4,000. They have no...
-
On February 2, 2012, Alexandra purchases a personal computer for her home. The computer cost $3,000. Alexandra uses the computer 80 percent of the time in her accounting business, 10 percent of the...
-
(a) Consider a silicon pn junction diode operating in the forward-bias region. Determine the increase in forward-bias voltage that will cause a factor of 10 increase in current. (b) Repeat part (a)...
-
A silicon pn junction diode has an emission coefficient of \(n=1\). The diode current is \(I_{D}=1 \mathrm{~mA}\) when \(V_{D}=0.7 \mathrm{~V}\). (a) What is the reverse-bias saturation current? (b)...
-
(a) The reverse-saturation current of a gallium arsenide pn junction diode is \(I_{S}=10^{-22} \mathrm{~A}\). Determine the diode current for diode voltages of \(0.8,1.0\), \(1.2,-0.02,-0.2\), and...