Rip Tide Company manufactures surfboards. Its standard cost information follows: Standard Price (Rate) $ 5 per...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Rip Tide Company manufactures surfboards. Its standard cost information follows: Standard Price (Rate) $ 5 per square feet $ 15 per hour $ 6 per hour Standard Unit Cost $ 75.00 150.00 60.00 80.00 Direct materials (fiberglass) Direct labor Variable manufacturing overhead (based on direct labor hours) Fixed manufacturing overhead ($24,000 + 300 units) Standard Quantity Rip Tide has the following actual results for the month of June: Number of units produced and sold Number of square feet of fiberglass purchased and used Cost of fiberglass used Number of labor hours worked Direct labor cost Variable overhead cost Fixed overhead cost Required: 15 square feet 10 hours 10 hours 314 4,940 $ 27,170 3,080 $ 48,356 $ 14,990 $ 24,700 1. Calculate the direct materials price, quantity, and total spending variances for Rip Tide. 2. Calculate the direct labor rate, efficiency, and total spending variances for Rip Tide. 3. Calculate the variable overhead rate, efficiency, and total spending variances for Rip Tide. 4. Calculate the fixed overhead spending (budget) and volume variances for Rip Tide. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Calculate the direct materials price, quantity, and total spending variances for Rip Tide. Note: Do not round your intermediate calculations. Enter the dollar value of the variance as an absolute value (positive number) and then use the drop-down menu to indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Direct Materials Price Variance Show less Rip Tide Company manufactures surfboards. Its standard cost information follows: Standard Price (Rate) $ 5 per square feet $ 15 per hour $ 6 per hour Standard Unit Cost $ 75.00 150.00 60.00 80.00 Direct materials (fiberglass) Direct labor Variable manufacturing overhead (based on direct labor hours) Fixed manufacturing overhead ($24,000 + 300 units) Standard Quantity Rip Tide has the following actual results for the month of June: Number of units produced and sold Number of square feet of fiberglass purchased and used Cost of fiberglass used Number of labor hours worked Direct labor cost Variable overhead cost Fixed overhead cost Required: 15 square feet 10 hours 10 hours 314 4,940 $ 27,170 3,080 $ 48,356 $ 14,990 $ 24,700 1. Calculate the direct materials price, quantity, and total spending variances for Rip Tide. 2. Calculate the direct labor rate, efficiency, and total spending variances for Rip Tide. 3. Calculate the variable overhead rate, efficiency, and total spending variances for Rip Tide. 4. Calculate the fixed overhead spending (budget) and volume variances for Rip Tide. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Calculate the direct materials price, quantity, and total spending variances for Rip Tide. Note: Do not round your intermediate calculations. Enter the dollar value of the variance as an absolute value (positive number) and then use the drop-down menu to indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Direct Materials Price Variance Show less
Expert Answer:
Answer rating: 100% (QA)
To calculate the direct materials price quantity and total spending variances for Rip Tide we need t... View the full answer
Related Book For
Managerial Accounting
ISBN: 978-0078025518
2nd edition
Authors: Stacey Whitecotton, Robert Libby, Fred Phillips
Posted Date:
Students also viewed these accounting questions
-
Rip Tide Company manufactures surfboards. Its standard cost information follows: Rip Tide has the following actual results for the month of June: Number of units produced and sold ......... 312...
-
Rip Tide Company manufactures surfboards. Its standard cost information follows. Rip Tide has the following actual results for the month of June: Number of units produced and sold ....... 312 Number...
-
Why would you use a prospective overhead rate to accumulate the overhead costs of a job?
-
A: Now consider the same set-up as in exercise 13.7 but assume throughout that labor is instantaneously variable, that capital is fixed in the short run and variable in the intermediate run, and that...
-
On January 14, at the end of the second week of the year, the totals of Castle Company's payroll register showed that its store employees' wages amounted to $33,482 and that its warehouse wages...
-
Indicate the effect (increase, decrease, or none) on sample size of the following change, assuming other factors are held constant: (a) increase reliability, (b) decrease upper precision limit, and...
-
Peabody Company owns 90% of the outstanding capital stock of Sloane Company. During 2011 and 2012 Sloane Company sold merchandise to Peabody Company at a markup of 25% of selling price. The selling...
-
1. Write a paragraph to explain what a wave is and the main characteristics of waves, to a group of students who have never taken physics. Then identify and describe 2 (two) different ways in which...
-
What integer shows that $$\exists the definition of perfect numbers in the video) x\:\left(Perfect\left(x ight)\wedge\left(20 is true? (Note: you can find
-
How does language develop?
-
What are the primary causes of changes in exchange rates over the long run?
-
On January 1, 2005, Power Corporation purchased 80% of the outstanding shares of Spencer Corporation for $2,500,000 in cash. On that date, Spencer Corporationss common shares had a carrying value of...
-
A false treatment, such as a pill that has no significant chemical properties or active ingredient, is known as a __________.
-
Some memory researchers believe that long-term memory is stored as associations between pieces of information in __________networks.
-
Online movie ticketing system is an application that deals with booking tickets online along with the prices and reservation should be done according to the availability. The problems associated are...
-
You are standing on the top of a building and throw a ball vertically upward. After 2 seconds, the ball passes you on the way down, and 2 seconds after that, it hits the ground below. a. What is the...
-
The same suspension as that in Problem 39 above was subsequently tested in a $28 \mathrm{~mm}$ internal diameter pipe, and the following data reported: $\Gamma\left(\mathrm{s}^{-1} ight)$ 127 200 289...
-
A mercury manometer is connected between two points in a piping system that contains water. The downstream tap is $6 \mathrm{ft}$ higher than the upstream tap, and the manometer reading is $16...
-
The manometer equation is $\Delta \Phi=-\Delta ho g \Delta h$, where $\Delta \Phi$ is the difference in the total pressure plus static head $(P+ho g z)$ between the two points to which the manometer...
Study smarter with the SolutionInn App