You are the Project Engineer for a school project which is experiencing water leak issues. The...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
You are the Project Engineer for a school project which is experiencing water leak issues. The project is a three-story classroom building (steel stud, drywall, and stucco finish) and a single-story auditorium building (masonry). Both buildings were built seven years ago. The school authorities are complaining that they are experiencing water leaks in both buildings and in most of the rooms during the rainy season. They suspect the water is coming from the windows and from the ceiling/roof on the 3rd floor. Be advised that the school authorities have also made it clear that this work can only be done during the summer break as they cannot disrupt any classes during construction - this gives you 70 calendar days to complete the project. Please provide an explanation on how you will resolve these issues. In your response, please be sure to address the following: Identify the scope of the project What will be your main focus while preparing the contract documents? What kind of contract procurement method (JOC, Formal Bid. 17406, etc.) would you recommend for this type of project and why? Explain how you will ensure that this work can be achieved in the short time of 70 calendar days. You are the Project Engineer for a school project which is experiencing water leak issues. The project is a three-story classroom building (steel stud, drywall, and stucco finish) and a single-story auditorium building (masonry). Both buildings were built seven years ago. The school authorities are complaining that they are experiencing water leaks in both buildings and in most of the rooms during the rainy season. They suspect the water is coming from the windows and from the ceiling/roof on the 3rd floor. Be advised that the school authorities have also made it clear that this work can only be done during the summer break as they cannot disrupt any classes during construction - this gives you 70 calendar days to complete the project. Please provide an explanation on how you will resolve these issues. In your response, please be sure to address the following: You are the Project Engineer for a school project which is experiencing water leak issues. The project is a three-story classroom building (steel stud, drywall, and stucco finish) and a single-story auditorium building (masonry). Both buildings were built seven years ago. The school authorities are complaining that they are experiencing water leaks in both buildings and in most of the rooms during the rainy season. They suspect the water is coming from the windows and from the ceiling/roof on the 3rd floor. Be advised that the school authorities have also made it clear that this work can only be done during the summer break as they cannot disrupt any classes during construction - this gives you 70 calendar days to complete the project. Please provide an explanation on how you will resolve these issues. In your response, please be sure to address the following: You are the Project Engineer for a school project which is experiencing water leak issues. The project is a three-story classroom building (steel stud, drywall, and stucco finish) and a single-story auditorium building (masonry). Both buildings were built seven years ago. The school authorities are complaining that they are experiencing water leaks in both buildings and in most of the rooms during the rainy season. They suspect the water is coming from the windows and from the ceiling/roof on the 3rd floor. Be advised that the school authorities have also made it clear that this work can only be done during the summer break as they cannot disrupt any classes during construction - this gives you 70 calendar days to complete the project. Please provide an explanation on how you will resolve these issues. In your response, please be sure to address the following: Identify the scope of the project What will be your main focus while preparing the contract documents? What kind of contract procurement method (JOC, Formal Bid. 17406, etc.) would you recommend for this type of project and why? Explain how you will ensure that this work can be achieved in the short time of 70 calendar days. Identify the scope of the project What will be your main focus while preparing the contract documents? What kind of contract procurement method (JOC, Formal Bid. 17406, etc.) would you recommend for this type of project and why? Explain how you will ensure that this work can be achieved in the short time of 70 calendar days. Identify the scope of the project What will be your main focus while preparing the contract documents? What kind of contract procurement method (JOC, Formal Bid. 17406, etc.) would you recommend for this type of project and why? Explain how you will ensure that this work can be achieved in the short time of 70 calendar days.
Expert Answer:
Related Book For
Microeconomics An Intuitive Approach with Calculus
ISBN: 978-0538453257
1st edition
Authors: Thomas Nechyba
Posted Date:
Students also viewed these accounting questions
-
A certain bridge arch is in the shape of half an ellipse 120 feet wide and 30.7 feet high. At what horizontal distance from the center of the arch is the height equal to 16.9 feet? feet 1 answer
-
A 14-foot piece of string is cut into two pieces so that the longer piece is 2 feet longer than twice the shorter piece. Find the lengths of both pieces. What is the lenath of the shorter oiece?1...
-
suppose there is a 1.2 drop in temperature for every thousand feet that an airplane climbs into the sky. if the temperatureon the ground is 63.1, what will be the temperature when the plane reaches...
-
Direct Materials Budget The MSC Company has anticipated its unit sales for the first half of 2022 as follows: 2022 Units January 12,000 February 14,000 March 15,000 16,000 17,000 18,000 April May...
-
A ball placed at a focus of an elliptical billiard table is shot with tremendous force so that it continues to bounce off the cushions indefinitely. Describe its ultimate path?
-
In Problems 510, determine the viewing window used. NORMAL FLOAT AUTO REAL RADIAN MP 10- 32 0 9
-
In early 2006, Merck AG, a global pharmaceutical company, saw its share price decline dramatically after a jury in the United States found the company guilty of failing to warn consumers about safety...
-
Dillman Corporation has nexus in States A and B. Dillmans activities for the year are summarized below. Determine the apportionment factors for A and B assuming that A uses a three-factor...
-
LAW2295 Introduction to Cybersecurity Assignment 2 There is a hate group online and they are cyberstalking/cyberbullying an individual, Robert. Robert had come to you, a police officer, to lodge a...
-
A fish swimming in a horizontal plane has velocity = (4.00 + 1.00 ) m/s at a point in the ocean where the position relative to a certain rock is = (14.01 - 2.60 ) m. After the fish swims with...
-
The Problem 4 worksheet contains a variation of the Tax Calculations example discussed in class. In this problem you will once again calculate the income taxes due for each person based on their...
-
Managers of the company MFG have noticed increased absence among its employees, and the company has decided it needs an absenteeism analysis. It wants answers to the following questions using...
-
A company reported the following details: Cost of Goods Sold = $115,000 Decrease in inventory = $21,000 Decrease in accounts payable = $8,000 Using the direct method, how much is cost of goods sold...
-
At a certain location, the Earth's magnetic field has a magnitude of 5.710 5 T and points in a direction that is 77 below the horizontal. Part A Find the magnitude of the magnetic flux through the...
-
Two scales support a massless plank from either end, separated by 3 m. A person, whose height is less than 3 m, lies down on the plank with their head on the leftmost scale. The leftmost scale reads...
-
DEF Company incorporated on January 1, 2018 after receiving authorization to issue 5,000 shares of $100 par value preferred stock and 500,000 shares of $10 par value common, with the former having a...
-
B.) What is the approximate concentration of free Zn 2+ ion at equilibrium when 1.0010 -2 mol zinc nitrate is added to 1.00 L of a solution that is 1.080 M in OH - . For [Zn(OH) 4 ] 2- , K f = 4.610...
-
We discussed in the text the basic externality problem that we face when we rely on private giving to public projects. In this exercise, we consider how this changes as the number of people involved...
-
A: Suppose you have a homothetic production technology and you face output price p and input prices ( w , r ) . (a) On a graph with labor on the horizontal and capital k on the vertical axis, draw an...
-
The following is intended to explore what kinds of own-price demand relationships are logically possible in a two-good model with exogenous income (unless otherwise specified). A: For each of the...
-
What might cause board members to micromanage?
-
When a board member leaves the board, when is it desirable or wise to keep this person involved with the organization? How could this be accomplished?
-
What is meant by board - driven and CEO - driven organizations? What might be the distinctive characteristics of each?
Study smarter with the SolutionInn App