There is a project with three main modules. The size estimated for these modules are as follows:
Fantastic news! We've Found the answer you've been seeking!
Question:
There is a project with three main modules. The size estimated for these modules are as follows: Input: 600; Output: 700; and screen: 150 (all in LOC) Project is developed through a waterfall model with average productivity which is 450 LOC per PM. Compute the phase-wise effort required.