Suppose that a single-sampling plan with n = 150 and c = 2 is being used for

Question:

Suppose that a single-sampling plan with n = 150 and c = 2 is being used for receiving inspection where the supplier ships the product in lots of size N = 3,000.
Suppose that a single-sampling plan with n = 150 and

(a) Draw the OC curve for this plan.
(b) Draw the AOQ curve and find the AOQL.
(c) Draw the ATI curve for this plan.