The producer of electronic circuits in problem 4 has reconsidered the method of quality control and has

Question:

The producer of electronic circuits in problem 4 has reconsidered the method of quality control and has decided to use process control by variables instead of attributes. For variables control, a circuit voltage will be measured using a sample of only five circuits. The past average voltage for samples of size 5 has been 3.4 volts, and the range has been 1.3 volts.
a. What would the upper and lower control limits be for the resulting control charts (average and range)?
b. Five samples of voltage are taken with the following results:
The producer of electronic circuits in problem 4 has reconsidered

What action should be taken, if any?
c. Discuss the pros and cons of using this variables control chart versus the control chart described in problem 4. Which do you prefer?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Operations Management in the Supply Chain Decisions and Cases

ISBN: 978-0073525242

6th edition

Authors: Roger Schroeder, M. Johnny Rungtusanatham, Susan Goldstein

Question Posted: