The producer of electronic circuits in problem 4 has reconsidered the method of quality control and has
Question:
a. What would the upper and lower control limits be for the resulting control charts (average and range)?
b. Five samples of voltage are taken with the following results:
What action should be taken, if any?
c. Discuss the pros and cons of using this variables control chart versus the control chart described in problem 4. Which do you prefer?