The results of a time study to perform a quality control test are shown in the following

Question:

The results of a time study to perform a quality control test are shown in the following table. On the basis of these observations, determine the normal and standard time for the test, assuming a 23% allowance factor.

The results of a time study to perform a quality

a Disregard-employee is smoking a cigarette (included in personaltime).

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Operations management

ISBN: 978-0132163927

10th edition

Authors: Jay Heizer, Barry Render

Question Posted: