The times required to complete each of eight jobs in a two-machine flow shop are shown in
Question:
a. Determine a sequence that will minimize makespan time.
b. Construct a chart of the resulting sequence, and find machine Bs idle time.
c. For the sequence determined in part a, how much would machine Bs idle time be reduced by splitting the last two jobs inhalf?