Thirty samples each of size 7 have been collected to establish control over a process. The following
Question:
(a) Calculate trial control limits for the two charts.
(b) On the assumption that the R chart is in control, estimate the process standard deviation.
(c) Suppose an s chart were desired. What would be the appropriate control limits and center line?