A contractor builds two types of homes. The Carolina requires one lot, $160,000 capital, and 160 worker-days
Question:
(a) Write the simplex matrix to maximize the profit.
(b) Use the simplex method to find how many of each type of home should be built to maximize profit, and find the maximum possible profit.