Avalanche, Inc. is a manufacturer of premium snow skis. The work is a combination of precision machining
Question:
(1) Molding
(2) Cutting
(3) Fiberglass weaving
(4) Gluing
(5) Finishing
(6) Waxing.
Avalanche is opening a new production facility and wants to lay it out as efficiently as possible. The number of loads of material moved from department to department at existing operations in other plants is shown below. Arrange the department for Avalanches new plant in a 2 x 3 grid so that nonadjacent loads areminimized.