Each cable of the side spans of the Golden Gate Bridge supports a load w = 10.2
Question:
Each cable of the side spans of the Golden Gate Bridge supports a load w = 10.2 kips/ft along the horizontal. Knowing that for the side spans the maximum vertical distance h from each cable to the chord AB is 30 ft and occurs at mid span, determine
(a) The maximum tension in each cable,
(b) The slope at B.
Transcribed Image Text:
1100 ft 496 ft 102 kips/
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 75% (16 reviews)
FBD AB FBD CB fo 2487 h30ft 1100 ft 8 W 102 4nooft 11220 kips ...View the full answer
Answered By
Shubhendu Singh
Students often say math is their most-hated academic subjects. But this is probably because they just don't understand how amazing math can be.
I find math to be profoundly beautiful and incredibly exciting. And when I teach Maths to any student I make them feel in the same way.
TUTORING EXPERIENCE
I have been working in Education sector since last 1 year. Currently I am working as a Maths faculty in EDUWORLD GLOBAL SCHOOL.
EDUCATION:
1-B.Sc(hons) in Mathematics from BHU Varanasi.
2-M.Sc in Mathematics from IISER Bhopal
0.00
0 Reviews
10+ Question Solved
Related Book For
Question Posted:
Students also viewed these Mechanical Engineering questions
-
Each cable of the Golden Gate Bridge supports a load w = 11.1 kips/ft along the horizontal. Knowing that the span L is 4150 ft and that the sag h is 464 ft, determine (a) The maximum tension in each...
-
Each cable of the Golden Gate Bridge supports a load w =11.1 kips/ft along the horizontal. Knowing that the span L is 4150 ft and that the sag h is 464 ft, determine (a) The maximum tension in each...
-
A truss ABC supports a load W at joint B, as shown in the figure. The length L1 of member AB is fixed, but the length of strut BC varies as the angle ( is changed. Strut BC has a solid circular cross...
-
Asset allocation explains a large portion of a portfolio return. However, the implementation issues involved inthe asset allocation process may reduce the efficiency of the asset allocation strategy,...
-
Spitfire SE started as a company on January 2, 2020, but was unable to begin manufacturing activities until July 1, 2020, because new factory facilities were not completed until that date. The Land...
-
The above-ground volume (stem and leaves) of a plant is Va(t) = 3.0t + 20.0 + t2/2, and the below-ground volume (roots) is Vb(t) = -1.0t + 40.0 where t is measured in days and volumes are measured in...
-
Define outsourcing and offshoring. Compare and contrast the two as HR administrative tools. Give examples of the decision factors to consider when choosing one over the other.
-
Jones Group has been generating stable after-tax return on equity (ROE) despite declining operating income. Explain how it might be able to maintain its stable after-tax ROE.
-
What is the current Remote Access Protocol used in Windows 2012? Explain.
-
Complex wave vectors in the energy gap find an expression for the imaginary part of the wave vector in the energy gap at the boundary of the first Brillouin zone, in the approximation that led to Eq....
-
A cable of length L + is suspended between two points which are at the same elevation and a distance L apart. (a) Assuming that is small compared to L and that the cable is parabolic, determine the...
-
A steam pipe weighting 50 lb/ft that passes between two buildings 60 ft apart is supported by a system of cables as shown. Assuming that the weight of the cable is equivalent to a uniformly...
-
Executory contracts are contracts where both sides have not yet performed their obligations. If your company has a long-term contract for the supply of raw materials to XYZ Ltd for 50,000 tons per...
-
Give an overview of problem solving.
-
Discuss procurement in terms of the purchasing interfaces, the purchasing cycle, ethics, and centralized versus decentralized decision making.
-
Discuss why you think it's important for an estimator to be efficient.
-
Describe TQM.
-
List several strategic, tactical, and operational responsibilities related to managing the supply chain.
-
Why do you think an overdraft is cheaper than a bank loan?
-
Continuation of Exercise 4-83. (a) What is the probability that the first major crack occurs between 12 and 15 miles of the start of inspection? (b) What is the probability that there are no major...
-
A car moving at 20 m/s with its horn blowing (f = 1200 Hz) is chasing another car going at 15 m/s in the same direction. What is the apparent frequency of the horn as heard by the driver being...
-
Determine the kinetic energy of the hollow parallelepiped of Prob.18.6.
-
Determine the kinetic energy of the disk of Prob. 18.7. Problem 18.7: A homogeneous disk of mass m = 8 kg rotates at the constant rate 1 = 12 rad/s with respect to arm OA, which itself rotates at the...
-
Determine the kinetic energy of the disk of Prob. 18.8. Problem 18.8: A homogeneous disk of mass m = 6 kg rotates at the constant rate 1 = 16 rad/s with respect to arm ABC, which is welded to a shaft...
-
Implement the definition of the function rotate ToLeft(), member of the DArray class, so that it rotates all the elements of the array object to the left by one position. Example: [6, 2, 5, 3] [2, 5,...
-
Write the definition of the of the function is Full() as a member function of the DArray class. The function returns true if the array is full, or false otherwise. Functions.cpp 1 #include "DArray.h"...
-
Write a program that will calculate the trajectory of a golf ball thrown with a velocity of 25.6 m/s at an angle of 0 = 35 relative to the horizontal, from a hill that is 2.1 meters above the ground...
Study smarter with the SolutionInn App