Corrosion problems and manufacturing defects rendered a gasoline pipeline between El Paso, TX, and Phoenix, AZ, subject
Question:
Corrosion problems and manufacturing defects rendered a gasoline pipeline between El Paso, TX, and Phoenix, AZ, subject to longitudinal weld seam failures. The pressure was reduced to 80% of the design value. If the reduced pressure resulted in delivery of less product valued at $100,000 per month, what will be the value of the lost revenue after a 2-year period at an interest rate of 15% per year, compounded continuously?