Two products are manufactured on two sequential machines. The following table gives the machining times in minutes

Question:

Two products are manufactured on two sequential machines. The following table gives the machining times in minutes per unit for the two products.

The daily production quotas for the two products are 80 and 60 units, respectively. Each machine runs 8 hours a day. Overtime, though not desirable, may be used if necessary to meet the production quota. Formulate the problem as a GP model.