Question: STEELCO manufactures two types of steel (steel 1 and steel 2) at two locations (plant 1 and plant 2). Three resources are needed to manufacture

STEELCO manufactures two types of steel (steel 1 and steel 2) at two locations (plant 1 and plant 2). Three resources are needed to manufacture a ton of steel: iron, coal, and blast furnace time. The two plants have different types of furnaces, so the resources needed to manufacture a ton of steel depend on the location (see Table below). Each plant has its own coal mine. Each day 12 tons of coal is available at plant 1 and 15 tons at plant 2. Each day, plant 1 has 10 hours of blast furnace time available, and plant 2 has 4 hours available. Iron ore is mined in a mine located midway between the two plants; 80 tons of iron is available each day. Each ton of steel 1 can be sold for $170/ton, and each ton of steel 2 can be sold for $160/ton. All steel that is sold is shipped to a single customer. It costs $80 to ship a ton of steel from plant 1, and $100 a ton from plant 2. BlueRail is a railway company which can ship coal between the two plants at $50/ton. However, BlueRail does not accept a job less than 6 tons. Steelco needs to maximise its profit. Please use linear programming (LP) to help Steelco decide whether to hire BlueRail or not. (10 marks)

Product steel 1 and plant steel 2 and plant steel 1 and

Product steel 1 and plant steel 2 and plant steel 1 and plant steel 2 and plant Iron SL9 0 8 6 7 5 Coal 3 3132 2 Blast 2 1 1

Step by Step Solution

3.44 Rating (151 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To solve this problem we need to set up a linear programming model Lets define the variables constra... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemistry Questions!