The East Wind Company has a power plant designed and built to serve its three manufacturing plants.
Question:
The East Wind Company has a power plant designed and built to serve its three manufacturing plants. Data for 2010 are as follows:
| Usage in Kilowatt-Hours | Usage in kiowatt-Hours |
Factory Location | Budget | Actual |
Pictou | 100,000 | 80,000 |
Amherst | 60,000 | 120,000 |
Yarmouth | 40,000 | 40,000 |
Budgeted fixed costs for the year were $1,000,000. Actual fixed costs for the year were $1,100,000.
Variable costs were budgeted as $10 per kilowatt-hour. The actual total variable costs were $2,200,000.
1. Calculate the amount of power costs that would be allocated to each of the three locations using a single rate based on budgeted costs.
2. Calculate the amount of power costs that would be allocated to each of the three locations using a dual rate method based on budgeted costs for fixed and actual costs for variable.
Engineering Economy
ISBN: 978-0133439274
16th edition
Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling