Question: 18-39 Physical units, inspection at various levels of completion, weighted-average process costing. SunEnergy produces solar panels. A key step in the conversion of raw


 


18-39 Physical units, inspection at various levels of completion, weighted-average process costing.

18-39 Physical units, inspection at various levels of completion, weighted-average process costing. SunEnergy produces solar panels. A key step in the conversion of raw silicon to a completed solar panel occurs in the assembly department, where lightweight photovoltaic cells are assembled into modules and connected on a frame. In this department, materials are added at the beginning of the process and conver- sion takes place uniformly. At the start of November 2017, SunEnergy's assembly department had 2,400 panels in beginning work in process, which were 100% complete for materials and 40% complete for conversion costs. An additional end of the month. These unfinished units are 100% complete for materials and 70% complete for conver- sion costs. ing moisture out of the modules and sealing the photovoltaic cells between layers of glass, normal The assembly department had 1,800 spoiled units in November. Because of the difficulty of keep- spoilage is approximately 12% of good units. The department's costs for the month of November are as follows: Direct materials costs Conversion costs Beginning WIP $ 76,800 123,000 Costs Incurred During Period $ 240,000 1,200,000 6 CHAPTER 18 SPOILAGE, REWORK, AND SCRAP Required 1. Using the format on page 728, compute the normal and abnormal spoilage in units for November, as- suming the inspection point is at (a) the 30% stage of completion, (b) the 60% stage of completion, and (c) the 100% stage of completion. 2. Refer to your answer in requirement 1. Why are there different amounts of normal and abnormal spoil- age at different inspection points? 3. Now assume that the assembly department inspects at the 60% stage of completion. Using the weighted average method, calculate the cost of units transferred out, the cost of abnormal spoilage, and the cost of ending inventory for the assembly department in November.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

1 Spoilage Calculation Given Data Beginning Work In Process WIP 2400 panels 100 complete for materials 40 for conversion Units Started in November 12000 panels Ending Work In Process WIP 3600 panels 1... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock