1. A ball whose kinetic energy is E, is projected at an angle of 45 to...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
1. A ball whose kinetic energy is E, is projected at an angle of 45° to the horizontal. The kinetic energy of the ball at the highest point of its flight will be (2002) 1) E 2) E/2 3) E/2 4) zero 2. From a building two balls A and B are thrown such that A is thrown upwards and B downwards (both vertically). If V and V, are their respective velocities on reaching the B. ground, then (2002) 1) V>V B 2) V = V, 3) V, > V, 4) their velocities depens on their masses 3. If a body looses half of its velocity on penetrating 3cm in a wooden block, then how much will it penetrate more before coming to rest ? (2002) 1) 1 cm 2) 2cm 3) 3 cm 4) 4 cm 4. Speeds of two identical cars are u and 4u at the specific instant. The ratio of the respective distances in which the two cars are stopped from that instant is (2002) 2) 1:4 3) 1:8 4) 1: 16 5. A car moving with a speed of 50 km/hr, can be stopped by brakes after at least 6 m. If the same car is moving at a speed of 100 km/hr, the minimum stopping distance is (2003) 1) 12 m 2) 18 m 3) 24 m 4)6 m 1. A ball whose kinetic energy is E, is projected at an angle of 45° to the horizontal. The kinetic energy of the ball at the highest point of its flight will be (2002) 1) E 2) E/2 3) E/2 4) zero 2. From a building two balls A and B are thrown such that A is thrown upwards and B downwards (both vertically). If V and V, are their respective velocities on reaching the B. ground, then (2002) 1) V>V B 2) V = V, 3) V, > V, 4) their velocities depens on their masses 3. If a body looses half of its velocity on penetrating 3cm in a wooden block, then how much will it penetrate more before coming to rest ? (2002) 1) 1 cm 2) 2cm 3) 3 cm 4) 4 cm 4. Speeds of two identical cars are u and 4u at the specific instant. The ratio of the respective distances in which the two cars are stopped from that instant is (2002) 2) 1:4 3) 1:8 4) 1: 16 5. A car moving with a speed of 50 km/hr, can be stopped by brakes after at least 6 m. If the same car is moving at a speed of 100 km/hr, the minimum stopping distance is (2003) 1) 12 m 2) 18 m 3) 24 m 4)6 m
Expert Answer:
Related Book For
Posted Date:
Students also viewed these physics questions
-
The projectile is fired at an angle of 45 to the horizontal with an initial speed of 100 feet per second. In problem, find the range R and maximum height H. The path of a projectile fired at an...
-
A beam of electrons whose kinetic energy is K emerges from a thin-foil "window" at the end of an accelerator tube. A metal plate at distance d from this window is perpendicular to the direction of...
-
An extremely relativistic particle is one whose kinetic energy is much larger than its rest energy. Show that for an extremely relativistic particle E pc.
-
1. What is your brand/product? 2. Who is your target segment? 3. What are their needs/wants? 4. What message do you want to deliver to them?
-
Show that if the statement P(n) is true for infinitely many positive integers n and P(n + 1) P(n) is true for all positive integers n, then P(n) is true for all positive integers n.
-
If 4a 7 > 9, then which of the following cannot be equal to a? A. 3 B. 5 C. 7 D. 9 E. 11
-
A bar magnet is enclosed by a spherical surface. (a) What is the magnetic flux through the entire surface? (b) If the magnetic flux through the hemisphere closest to the magnet's north pole is...
-
McDowell Industries sells on terms of 3/10, net 30. Total sales for the year are $912,500; 40% of the customers pay on the 10th day and take discounts, while the other 60% pay, on average, 40 days...
-
"Managing Away Bad Habits Team Assignment Organizational Behavior IILeadership Assigned is ashort case from the exercise Managing Away Bad Habits. The task is to develop a turnaround strategy for...
-
Compute a depth-two decision tree for the training data in table 1 using the Gini function, C(a) = 2a(1 a) as described in class. What is the overall accuracy on the training data of the tree? XYZ...
-
The following data relate to the probability distributions of the lead time and demand of product "Que", Lead time (days) 15 Demand (units) 12,500 17,500 20 25. Additional information: 2. 3. 4. 5....
-
The flow rate in a 200-mm diameter pipeline connecting two reservoirs is 30 L/s. The pipeline consists of 600 m of straight pipe, a sharp-edged entrance, two 90 long radius bends, and a sudden...
-
Allie purchased a 1000 court-street bond that pays 6.3% annually six years later new corporate bond issues with comparable quality are paying 4.6% what is the approximate market value for Allie's...
-
Your employer is also considering the purchase of Biggerstaff & McDonald (B&M), a privately held company owned by two friends, each with 5 million shares of stock. B&M currently has free cash flow of...
-
To have a high degree of emotional intelligence, a person would need to be flexible and adaptable when dealing with others in your workplace. What does it mean to be flexible and adaptable within the...
-
We are concerned about the evolution of housing rental prices. We want to analyze the effects of regulating this market by introducing a price ceiling. Let the demand in the housing market be given...
-
The Village of Seaside Pines prepared the following enterprise fund Trial Balance as of December 31, 2020, the last day of its fiscal year. The enterprise fund was established this year through a...
-
Imagine a sound wave with a frequency of 1.10 kHz propagating with a speed of 330 m/s. Determine the phase difference in radians between any two points on the wave separated by 10.0 cm.
-
Find the absolute maximum and minimum values of f on the set D. f (x, y) = x + y - xy, D is the closed triangular region with vertices (0, 0), (0, 2), and (4, 0)
-
A vertical plate is submerged (or partially submerged) in water and has the indicated shape. Explain how to approximate the hydrostatic force against one side of the plate by a Riemann sum. Then...
-
Solve the inequality in terms of intervals and illustrate the solution set on the real number line. -5 < 3 - 2x < 9
-
A project under consideration has a 10-year projected life. The initial investment for the project is estimated to have a mean of \(\$ 10,000\) and a standard deviation of \(\$ 1,000\). The annual...
-
True or False: In determining the optimum replacement interval, it is necessary to assume negligible salvage values.
-
Match the terms in the first column with an appropriate definition from the second column. Terms (a) Breakeven analysis (b) Sensitivity analysis (c) Risk analysis Definitions (1) Determining how the...
Study smarter with the SolutionInn App