Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing system....
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Marlon Burke, the plant manager, has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Watson has the following data for its two departments for the coming year: Overhead costs (estimated) Normal activity (machine hours) Required: Department A Department B $2,660,000 140,000 $924,000 84,000 1. Calculate a predetermined overhead rate for the plant as a whole based on machine hours. $ per machine hour 2. Compute predetermined overhead rates for each department using machine hours. (Carry your calculations out to three decimal places.) Department A per machine hour Department B per machine hour 3. Job 73 used 40 machine hours from department A and 60 machine hours from department B. Job 74 used 60 machine hours from department A and 40 machine hours. from department B. Compute the overhead cost assigned to each job using the plantwide rate calculated in Requirement 1. Repeat the computation using the departmental rates found in Requirement 2. Job 73 Job 74 88 Departmental Which of the two approaches gives the fairer assignment? Plantwide Why? The input in the box below will not be graded, but may be reviewed and considered by your instructor. 4. Repeat Requirement 3, assuming the expected overhead cost for department B is $1,596,000 (not $924,000). Plantwide Departmental For Job 73 Job 74 company, ould you recommend departmental rates over a plantwide 5. Conceptual Connection: In most instances, why would a departmental rate be preferable to a plantwide rate? The input in the box below will not be graded, but may be reviewed and considered by your instructor. Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Marlon Burke, the plant manager, has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Watson has the following data for its two departments for the coming year: Overhead costs (estimated) Normal activity (machine hours) Required: Department A Department B $2,660,000 140,000 $924,000 84,000 1. Calculate a predetermined overhead rate for the plant as a whole based on machine hours. $ per machine hour 2. Compute predetermined overhead rates for each department using machine hours. (Carry your calculations out to three decimal places.) Department A per machine hour Department B per machine hour 3. Job 73 used 40 machine hours from department A and 60 machine hours from department B. Job 74 used 60 machine hours from department A and 40 machine hours. from department B. Compute the overhead cost assigned to each job using the plantwide rate calculated in Requirement 1. Repeat the computation using the departmental rates found in Requirement 2. Job 73 Job 74 88 Departmental Which of the two approaches gives the fairer assignment? Plantwide Why? The input in the box below will not be graded, but may be reviewed and considered by your instructor. 4. Repeat Requirement 3, assuming the expected overhead cost for department B is $1,596,000 (not $924,000). Plantwide Departmental For Job 73 Job 74 company, ould you recommend departmental rates over a plantwide 5. Conceptual Connection: In most instances, why would a departmental rate be preferable to a plantwide rate? The input in the box below will not be graded, but may be reviewed and considered by your instructor.
Expert Answer:
Answer rating: 100% (QA)
Requirement 1 Total Overhead Cost A Total machine Hours B P... View the full answer
Related Book For
Cornerstones of Managerial Accounting
ISBN: 978-0324660135
3rd Edition
Authors: Mowen, Hansen, Heitger
Posted Date:
Students also viewed these accounting questions
-
The plant manager has just purchased a piece of unusual machinery for $10,000. Its resale value at the end of 1 year is estimated to be $3000, because the device is sought by antique collectors,...
-
Carver Company uses a plantwide overhead rate based on direct labor cost. Suppose that during the year, Carver raises its wage rate for direct labor. How would that affect overhead applied? The total...
-
Lucien Ltd. manufactures custom-made doors and uses a normal job costing system to allocate overhead costs, based on labour hours. The direct labour rate is $40 per hour. Direct materials used in the...
-
Q2 You are an electrical inspector to measure the horizontal illuminance over the work plane of a rectangular room. Given : The size of the room is 10 m length x 7 m width. The illuminance grid p =...
-
Estimate the boiling point of a 0.050 m aqueous MgCl2 solution. Assume a value of i based on the formula.
-
The following is selected financial information for Sun Energy Company for the year ended December 31, 2011: revenues, $65,000; expenses, $50,000; net income, $15,000. Required Prepare the 2011...
-
I spent time with you. It seems that this deed is out of character for you. You were not awarded your normal annual bonus. I would probably feel the same. Is that what happened? You normally wouldnt...
-
Melton River Resort opened for business on June 1 with eight air-conditioned units. Its trial balance before adjustment on August 31 is as follows. In addition to those accounts listed on the trial...
-
Show that the two drawings represent the same graph by labeling the vertices and edges of the right-hand drawing to correspond to those of the left-hand drawing. 5 el 06 Veq 5 e2 V2 ez 3 U5 (a) es 1...
-
Angela Care Homes Ltd. (Angela) operates 14 care homes for people suffering with mental illness in Western Canada. It hopes to expand to Eastern Canada over the next few years and is considering...
-
You are a part of the team responsible for planning the Argent Minerals Limited(ASX code ARD), a food and beverage company, audit engagement for 2021. You are required to gather relevant background...
-
Supply is most elastic in ______. a) the market period b) the short run c) the long run
-
If the price system is allowed to function without interference and a shortage occurs, quantity demanded will __________ and quantity supplied will _____as the price rises to its equilibrium level....
-
A tax will ______. a) lower price and raise supply b) lower price and lower supply c) raise price and lower supply d) raise price and raise supply
-
The imposition of a tax _________. a) raises both supply and demand b) lowers neither supply nor demand c) lowers only supply d) lowers only demand
-
When quantity demanded is greater than quantity supplied, _______. a) market price will rise b) market price will fall c) market price will stay the same
-
Consider the transform function: void transform (int* a, int* b, int n) { for (int i=0; i
-
I frequently use NY Times and CNN and am aware of Fox News but I never use it. I visit these sites, NY Times and CNN, a few times a week whenever I have to research something or see something on...
-
Petoskey Company produces three products: Alanson, Boyne, and Conway. A segmented income statement, with amounts given in thousands, follows: Direct fixed expenses consist of depreciation and plant...
-
Refer to the information regarding Hoosier Buddy as shown in Exercise 16-36. Also, assume that Hoosiers total assets at the beginning of last year equaled $17,350,000 and that the tax rate applicable...
-
In the coming year, Gascon Company expects to sell 74,600 units at $30 each. Gascons controller provided the following information for the coming year. Units production .............80,000 Unit...
-
Consider an unstable plant \[G(s)=\frac{s+2}{s^{3}+4 s^{2}-5 s}\] with feedback control, as shown in Figure 10.15. a. Using Routh's stability criterion, determine the range of the control gain \(K\)...
-
Consider the closed-loop control system shown in Figure 10.24. a. Using MATLAB, plot the unit-step responses of the system for the following values of \(K: 5,50\), and 500 . b. Compute the...
-
Consider a mass-damper-spring system \(G(s)=Y(s) / U(s)=1 /\left(m s^{2}+b s+k ight)\), where \(m=1 \mathrm{~kg}, b=8 \mathrm{~N} \cdot \mathrm{s} / \mathrm{m}\), and \(k=40 \mathrm{~N} /...
Study smarter with the SolutionInn App