Instead of a new 500-MW coal-fired power plant, a wind farm of turbines rated at 2 MW
Question:
Instead of a new 500-MW coal-fired power plant, a wind farm of turbines rated at 2 MW maximum output each is to be installed. If the average turbine output is 40 percent of the maximum, how many turbines are needed?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Question Posted: