The cost of Solar 1 plant in California with a capacity of 10 MW was estimated to be $14,000/kW. If electricity generated is sold at a price of $0.09/kWh, how long will it take for this plant to pay for

The cost of Solar 1 plant in California with a capacity of 10 MW was estimated to be $14,000/kW. If electricity generated is sold at a price of $0.09/kWh, how long will it take for this plant to pay for itself? Assume the plant operates 5000 hours a year at the maximum capacity of 10 MW.

This problem has been solved!


Do you need an answer to a question different from the above? Ask your question!
Related Book For  answer-question

Thermodynamics An Engineering Approach

ISBN: 978-0073398174

8th edition

Authors: Yunus A. Cengel, Michael A. Boles

Posted Date: April 01, 2016 06:01:58