If the rate of labor use in Problem 75 is g(x) = 2,000x -1/3 then approximately how

Question:

If the rate of labor use in Problem 75 is
g(x) = 2,000x -1/3
then approximately how many labor-hours will be required to assemble the 9th through the 27th control units? [Hint. Let a = 8 and b = 21.)