Can a project have two critical paths? Why or why not? Give a brief example to illustrate
Question:
Can a project have two critical paths? Why or why not? Give a brief example to illustrate your point.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 87% (8 reviews)
You can have more than one critical path in a project so that several paths run concurrently This ca...View the full answer
Answered By
Sandra Dimaala
Sandra from Philippines ,LICENSED PROFESSIONAL TEACHER.
Teachers are our nation builders—the strength of every profession in our country grows out of the knowledge and skills that teachers help to instill in our children. And, as a nation, we must do much, much more to fully appreciate and support their work.
0.00
0 Reviews
10+ Question Solved
Related Book For
Modern Systems Analysis And Design
ISBN: 9780134204925
8th Edition
Authors: Joseph Valacich, Joey George
Question Posted:
Students also viewed these Computer science questions
-
Can a project have two paths that are critical paths? Explain why or why not. Give an example if possible.
-
Can a project have multiple critical paths? Explain.
-
Can a project have negative cash flows for the first few years before having positive cash flows ?
-
Craps is a dice game in which two fair dice are cast. If the roller shoots a 7 or 11 on the rst roll, he or she wins. If the roller shoots a 2, 3, or 12 on the rst roll, he or she loses. (a) Compute...
-
Explain how a creditor might analyze a statement of cash flows.
-
In what ways can accounting standards be improved to restrict creative accounting?
-
People often think that only accountants need to know accounting. Many students may not consider taking accounting because they have no interest in being an accountant. Whether students aspire to be...
-
1. What factors should companies take into consideration when making the decision between developing their own applications, purchasing them from a vendor, or taking the SaaS route, as discussed...
-
Problem 11-24 (Algo) Return on Investment (ROI) Analysis [LO11-1] Last years contribution format income statement for Huerra Company is given below: Total Unit Sales $ 1,008,000 $ 50.40 Variable...
-
Double Corporation acquired all of the common stock of Simple Company for $450,000 on January 1, 20X4. On that date, Simples identifiable net assets had a fair value of $390,000. The assets acquired...
-
Calculate the expected time for the following activities. Optimistic Most Likely Pessimistic Expected Time Activity Time Time Time A 3 7 11 13 D 16 E 4 18 F 11 G 4 H. 4 4 12 7 9 O23 5122N M13 24
-
Search computer magazines or the web for recent reviews of project management software. Which packages seem to be most popular? What are the relative strengths and weaknesses of each software...
-
If an alluvial forest soil were flooded for 10 days and you sampled the gases evolving from the, wet soil, what gases would you expect to find (other than oxygen and carbon dioxide)? In what order of...
-
13 Synthesize a slider-crank mechanism for its three positions = 60 and 0 = 100 of the input crank and three positions x = 2 cm and x = 5 cm of the output slider block. The eccentricity is 2 cm. The...
-
Asus Company is engaged in printing and publishing. Printing jobs are priced at cost plus 60% . Job C11 involved printing 600 wedding invitations with the following costs: Direct Materials P360...
-
What advancements in virtual memory research are driven by emerging technologies such as non-volatile memory, heterogeneous memory architectures, and hardware accelerators, and how do these...
-
For each of the following projects compute (I) pay-back period, (ii) post payback profitability (iii) post-back profitability index a) Initial outlay Shs.50,000,000 Annual cash inflow (after tax but...
-
What are the ecological consequences of trophic cascades in complex ecosystems, and how do disturbances, such as climate change or habitat fragmentation, impact the stability and resilience of...
-
Whole Nature Foods sells a gluten-free product for which the annual demand is 5,000 boxes. At the moment, it is paying $6.40 for each box; carrying cost is 25% of the unit cost; ordering costs are...
-
The maximum pressure that can be developed for a certain fluid power cylinder is 15.0 MPa. Compute the required diameter for the piston if the cylinder must exert a force of 30 kN.
-
List and describe the components of a SWOT analysis.
-
Assume that at Pine Valley Furniture, each product (described by product number, description, and cost) is composed of three components (described by component number, description, and unit of...
-
Each semester, each student must be assigned an adviser who counsels students about degree requirements and helps students register for classes. Each student must register for classes with the help...
-
Arguer creates the impression that you might be socially left behind or that everyone is engaged in a certain activity and it appeals to our desire to want to be included in the latest trend. Fallacy...
-
There's no missing information or reference. That's the complete information. Thank you ACTUARIAL SCIENCE QUESTION LIFE CONTINGENCIES HURRY UP PLEASE AND PLEASE SOLVE IT ALL CORRECTLY I WILL VOTE
-
Different cash flow. Given the cash inflow in the following table, LOADING... , what is the present value of this cash flow at 5 % , 1 1 % , and 2 7 % discount rates? Question content area bottom...
Study smarter with the SolutionInn App