The following observations were obtained randomly over an 8-hour time period on the Zip operator, during which
Question:
The following observations were obtained randomly over an 8-hour time period on the Zip operator, during which time he assembled 20 Zip drives.
a) How many minutes of a typical 8-hour work day is the Zip operator working?
b) What is the average performance of the Zip operator?
c) What is the normal time for the Zip operator?
d) What is the %error for this study?